background image

420705-UIM-C-0310

EFFICIENCY
RATING
CERTIFIED

ISO 9001

Certified Quality

Management System

MANUFACTURED HOUSING OR MODULAR 
HOME GAS FURNACE 

MODELS:
MG9S*MP - 33” Models – 

Shipped in Downflow Configuration

(95.5% AFUE Single Stage Multi-position)

INSTALLATION MANUAL

LIST OF SECTIONS

SAFETY   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
DUCTWORK  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
FILTERS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
GAS PIPING  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
ELECTRICAL POWER  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
CONDENSATE PIPING AND FURNACE 
VENTING CONFIGURATION  . . . . . . . . . . . . . . . . . . . . . . . . . . 13

COMBUSTION AIR and VENT SYSTEM . . . . . . . . . . . . . . . . . 17
START-UP AND ADJUSTMENTS  . . . . . . . . . . . . . . . . . . . . . . 23
SAFETY CONTROLS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
NORMAL OPERATION AND DIAGNOSTICS  . . . . . . . . . . . . . 29
REPLACEMENT PARTS LIST  . . . . . . . . . . . . . . . . . . . . . . . . . 31
REPLACEMENT PART CONTACT INFORMATION  . . . . . . . . 31
WIRING DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

LIST OF FIGURES

Duct Attachment   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Attachment to Structure  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Combustible Floor Base Accessory . . . . . . . . . . . . . . . . . . . . . . . 6
Mobile Home Filter Frame Accessories . . . . . . . . . . . . . . . . . . . . 6
Blend Air Bracket  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Blend Air Installation (Optional)  . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Vertical Applications   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Coil Flange   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
PC Series Upflow Coil Installation  . . . . . . . . . . . . . . . . . . . . . . . . 8
Combustible Floor Base Accessory . . . . . . . . . . . . . . . . . . . . . . . 8
Downflow Venting   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Dimensions (Upflow configuration shown)   . . . . . . . . . . . . . . . . . 9
Side Return Cutout Markings   . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Gas Valve   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Upflow/Downflow Gas Piping   . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Electrical Wiring  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Line Wiring Connections  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Single Stage Heat Thermostat Connections  . . . . . . . . . . . . . . . 12
Accessory Connections  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Typical. Condensate drain, vertical installation  . . . . . . . . . . . . . 13
Typical. Combustion Pipe Drain Tee . . . . . . . . . . . . . . . . . . . . . 14
Upflow Configuration  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Downflow Configuration   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Dimensions  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Home Layout  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Termination Configuration - 2 Pipe  . . . . . . . . . . . . . . . . . . . . . . 20
Termination Configuration - 2 Pipe Basement   . . . . . . . . . . . . . 20
Double Horizontal Combustion Air Intake 
and Vent Termination   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Double Vertical Combustion Air Intake
 and Vent Termination  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Direct Vent Air Intake Connection and Vent Connection . . . . . . 21
Outside and Ambient Combustion Air  . . . . . . . . . . . . . . . . . . . . 22
Attic and Crawl Space Combustion Air Termination  . . . . . . . . . 23
Gas Valve  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Reading Gas Pressure   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Furnace Control Board   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Furnace Control Event Schedule   . . . . . . . . . . . . . . . . . . . . . . . 31
Wiring Diagram  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

LIST OF TABLES

Unit Clearances to Combustibles   . . . . . . . . . . . . . . . . . . . . . . . . 4
Coil Projection Dimensions - PC Series Coils  . . . . . . . . . . . . . . . 8
Cabinet and Duct Dimensions  . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Recommended Filter Sizes (High Velocity 600 FPM)  . . . . . . . . . 9
Nominal Manifold Pressure - High Fire  . . . . . . . . . . . . . . . . . . . 11
Ratings & Physical / Electrical Data   . . . . . . . . . . . . . . . . . . . . . 12
Maximum Equivalent Pipe Length  . . . . . . . . . . . . . . . . . . . . . . . 17
Elbow Dimensions  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Equivalent Length of Fittings  . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

Combustion Air Intake and Vent Connection 
Size at Furnace (All Models)  . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Estimated Free Area  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Unconfined Space Minimum Area in Square Inch . . . . . . . . . . . 21
Free Area   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Gas Rate (CU FT/HR) at Full Input  . . . . . . . . . . . . . . . . . . . . . . 25
Inlet Gas Pressure Range  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Nominal Manifold Pressure  . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Blower Performance CFM - Any Position (Without Filter)  . . . . . 28

These high efficiency, compact units employ induced combustion, reli-
able hot surface ignition and high heat transfer aluminized tubular heat
exchangers. The units are factory shipped for installation in downflow
applications and may be converted for upflow applications.

These furnaces are designed for residential installation in a basement,
closet, alcove, attic, recreation room or garage applications. All units
are factory assembled, wired and tested to assure safe dependable and
economical installation and operation.

These units are Category IV listed and may not be common vented with
another gas appliance as allowed by the National Fuel Gas Code.

Summary of Contents for MG9S*MP

Page 1: ...and Vent Termination 20 Double Vertical Combustion Air Intake and Vent Termination 20 Direct Vent Air Intake Connection and Vent Connection 21 Outside and Ambient Combustion Air 22 Attic and Crawl Space Combustion Air Termination 23 Gas Valve 26 Reading Gas Pressure 26 Furnace Control Board 27 Furnace Control Event Schedule 31 Wiring Diagram 32 LIST OF TABLES Unit Clearances to Combustibles 4 Coil...

Page 2: ...ving or handling this furnace prior to installation always leave the doors on the furnace to provide support and to prevent damage or warping of the cabinet When lifting the furnace by the cabinet support the ends of the furnace rather than lifting by the cabinet flanges at the return air openings bottom or sides or sup ply air opening 13 When lifting the furnace it is acceptable to use the primar...

Page 3: ...TANDARDS Follow all national local codes and standards in addition to this installa tion manual The installation must comply with regulations of the serv ing gas supplier local building heating plumbing and other codes In absence of local codes the installation must comply with the national codes listed below and all authorities having jurisdiction In the United States and Canada follow all codes ...

Page 4: ...r alcove installation FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in part for resi dential purposes including those owned or operated by the Com monwealth and where the side wall exhaust vent termination is less than seven 7 feet above finished grade i...

Page 5: ...tor A coil drain pans are to be installed in the upflow horizontal configura tion then extra 2 minimum spacing may be needed to ensure against drain pan distortion On all installations without a coil a removable access panel is recom mended in the outlet duct such that smoke or reflected light would be observable inside the casing to indicate the presence of leaks in the heat exchanger This access...

Page 6: ...ovided the combustion air and vent system have been installed and maintained as a Two Pipe Sealed Combustion Air System and provided a return air duct and plenum are not required by state local or regional codes If a return air duct system and return plenum are required by state local or regional codes then the return plenum may be con nected to the furnace inlet and must terminate outside the spa...

Page 7: ...no conversion Position the coil casing over or under the furnace opening as shown in Figure 7 after configuring coil flanges as required see Coil Flange sec tion below COIL FLANGE INSTALLATION The coils include removable flanges to allow proper fit up with furnaces having various inlet and outlet flange configurations The two flanges are attached to the top of the coil in the factory during produc...

Page 8: ...oor and sealed Refer to the instructions supplied with the duct con nector for proper installation Refer to the separate accessory parts list at the end of these instructions for the approved accessory duct con nectors DOWNFLOW APPLICATION Furnace is shipped in downflow configuration It may be necessary to rotate the vent blower 180 left so that the vent pipe passes through the side of the furnace...

Page 9: ...bustion Air Inlet Gas Pipe Entry Electrical Entry Condensate Drain Optional Return Air Cutout Either side 29 5 For Cladded door add appoximately an additional 75 C SUPPLY END 56 56 20 B 3 23 8 56 Combustion Air Inlet Vent Outlet RETURN END B 24 25 Table 3 Cabinet and Duct Dimensions BTUH kW Input Nominal CFM m3 min Cabinet Size Cabinet Dimensions Inches Approximate Operating Weights A A cm B B cm ...

Page 10: ...s orifices Plan your gas supply before determining the correct gas pipe entry Use 90 degree service elbow s or short nipples and conventional 90 degree elbow s to enter through the cabinet access holes FIGURE 14 Gas Valve INLET WRENCH BOSS INLET PRESSURE PORT O N O FF ON OFF SWITCH Shown in ON position MAIN REGULATOR ADJUSTMENT OUTLET OUTLET PRESSURE PORT VENT PORT An overpressure protection devic...

Page 11: ...or specific furnace electrical data Never use an open flame to check for leaks Fire or explosion could occur Since some leak solutions including soap and water may cause corrosion or stress cracking the piping must be rinsed with water after testing unless it has been determined that the leak test solution is non corrosive Table 5 Nominal Manifold Pressure High Fire Manifold Pressures in wc Manifo...

Page 12: ...ections on the thermostat to the terminal board on the ignition module as shown in Figure 18 Electronic thermo stats may require the common wire to be connected Apply strain relief to thermostat wires passing through cabinet If air conditioning equip ment is installed use thermostat wiring to connect the Y and C termi nals on the furnace control board to the proper wires on the condensing unit uni...

Page 13: ...n better if an open stand pipe is installed in the drain line See Figure 20 If evaporator coil or humidifier drains are combined with the furnace drain then the open stand pipe could be raised higher above the 5 minimum FIGURE 19 Accessory Connections The Figures 22 23 show the condensate drain arrangement for the various possible furnace and vent blower positions The furnace condensate pan is sel...

Page 14: ... furnace FIGURE 21 Typical Combustion Pipe Drain Tee Connect to Drain Trap Combustion Air Pipe Tee with Drain Trap Exhaust Pipe DO NOT terminate the condensate drain in a chimney or where the drain line may freeze If the drain line will be exposed to tempera tures below freezing adequate measures must be taken to prevent the drain line from freezing Failure to provide proper protection from freezi...

Page 15: ...off so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose Move rain gutter hose to this position For 100 120 input furnaces the condensate drain is plumbed toward the left casing outlet from the factory For 060 080K input furnaces the condensate drain is p...

Page 16: ...itch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to this position When drain hose routing changes are required be sure to cap all un used openings If rerouting hoses excess length should be cut off so that no sagging loops will collect and hold conde...

Page 17: ...ment that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a flexible connector is used in the vent system it must be made of a material that is resistant to acidic exposure and to at least 225 F temperature Flexible connectors are also allowed in the combustion air pipe 6 All models are supplied with 2 vent connections When the pipe must b...

Page 18: ...event sagging 9 Seal around the openings where the combustion air and or vent piping pass through the roof or sidewalls COMBUSTION AIR VENTING TABLE 9 Equivalent Length of Fittings Fitting Equivalent Length 2 90º sweep elbow 5 feet of 2 pipe 2 45º sweep elbow 2 1 2 feet of 2 pipe 2 90º standard elbow 7 feet of 2 pipe 2 45º standard elbow 3 1 2 feet of 2 pipe 3 90º sweep elbow 5 feet of 3 pipe 3 45...

Page 19: ...equirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier G Clearance to inside corner 3 feet 91 4 ...

Page 20: ...r combustion air or venti lated combustion air and the instructions for installing the vent system with the vent terminating as shown in Figures 28 or 29 The two pipe system must have a separate combustion air pipe and a separate vent pipe for each furnace Under NO circumstances can the two combus tion air or vent pipes be tied together The combustion air and vent pipes must terminate in the same ...

Page 21: ...ally adjustable louvers are not permitted for use 4 A automatically operated damper or automatically adjustable lou vers shall be interlocked so that the main burner cannot operate unless either the damper or the louver is in the fully open position An optional plastic birdscreen is shipped in the loose parts bag with every furnace This may be installed in the intake collar to prevent any small ob...

Page 22: ...l input rating of all equipment located in the enclosure b Not less than the sum of all vent connectors in the confined space 3 The duct shall be least the same cross sectional area as the free area of the air supply inlet opening to which it connects 4 The blocking effects of louvers grilles and screens must be given consideration in calculating free area If the free area of a specific louver or ...

Page 23: ...e and horizontal pitch Determine that there is no blockage restriction leakage corrosion or other deficiencies which could cause an unsafe condition 2 Close all building doors and windows and all doors 3 Turn on clothes dryers and TURN ON any exhaust fans such as range hoods and bathroom exhausts so they shall operate at maximum speed Open the fireplace dampers Do not operate a summer exhaust fan ...

Page 24: ...tion to adjust the manifold pressure Repeat steps 2 5 until correct input is achieved HOT SURFACE IGNITION SYSTEM Do not attempt to light this furnace by hand with a match or any other means There may be a potential shock hazard from the components of the hot surface ignition system The fur nace can only be lit automatically by its hot surface ignition system DO NOT set manifold pressure less than...

Page 25: ...0 300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232 581 92 39 78 196 32 113 225 563 94 38 76 192 33 109 218 545 96 38 75 188 34 106 212 529 98 37 74 184 35 103 206 514 100 36 72 180 36 100 200 500 102 35 71 178 37 97 195 486 104 35 69 173 38 95 189 4...

Page 26: ...ressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After the manifold pressure has been adjusted re calculate the furnace input to make sure you have not exceeded the specified input on the rating plate Refer to CALCULATING THE FURNACE INPUT NATURAL GAS 5 Once the correct BTU kW input has been established turn the gas valve to OFF and turn the electrical sup...

Page 27: ...ings 60 90 120 and 180 seconds The fan off delay is factory set to 120 sec onds The fan off setting must be long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as shown in Figure 35 The temperature rise or temperature difference between the return air and the sup...

Page 28: ...gh 2341 2245 2153 2072 1977 1876 1769 1642 1506 1306 Medium High 2002 1952 1878 1823 1739 1657 1563 1458 1322 1185 Medium Low 1615 1579 1533 1473 1430 1368 1282 1186 1091 953 Low 1352 1295 1259 1245 1190 1141 1076 998 938 820 Left Side Airflow Data SCFM Models Input Airflow Cabinet Speed Ext Static Pressure in H2O 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 0 60 1200 B High 1470 1406 1361 1309 1241 1155...

Page 29: ...he pressure switch will close the ignition control pro vides a 17 second ignitor warm up period the gas valve then opens the gas starts to flow ignition occurs and the flame sensor begins its sensing function The blower motor will energize 30 seconds after the gas valve opens if a flame is detected Normal furnace operation will continue until the thermostat circuit between R and W is opened which ...

Page 30: ...rnace will lock out for one hour and then restart 8 RED FLASHES This fault is indicated if the flame is lost 5 times 4 recycles during the heating cycle This could be caused by low gas pressure dirty or faulty flame sensor or faulty gas valve The furnace will lock out for one hour and then restart 9 RED FLASHES Indicates reversed line voltage polarity or grounding problem Both heating and cooling ...

Page 31: ...Req d BRACKET BLOWER TRACK 2 Req d HEAT EXCHANGER ASS Y FABRICATED PARTS Continued MANIFOLD GAS PAN BOTTOM PANEL TOP PANEL DOOR 2 Req d PANEL BLOCKOFF MISCELLANEOUS ORIFICE BURNER Natural 45 SIGHT GLASS OVAL 2 Req d GASKET FOAM Door 1 5 ft req d PAN CONDENSATE BRACKET DOOR HARNESS WIRING FERRULE 3 Req d GROMMET 3 Req d MOTOR MOUNT TUBING SILICON HOSE RAIN GUTTER HOSE CONDENSATE PLUG SEAL 7 8 PLUG ...

Page 32: ...hed in U S A 420705 UIM C 0310 Copyright 2010 by Johnson Controls Inc All rights reserved Supersedes 420705 UIM A 1209 Johnson Controls Unitary Products P O Box 19014 Wichita KS 67204 9014 SECTION XII WIRING DIAGRAM FIGURE 37 Wiring Diagram ...

Reviews: