45

Figure 22: Gas Valve Piping

Two Stage Furnace Only

If a W1 only call for heat from a two stage thermostat is present, 
then a two stage furnace will start on high fire for 1 minute and 
then reduce to low fire until the call for heat is satisfied or a W2 
call for heat is received. If a W2 call for heat is received while in 
low fire operation, then the ICB will immediately move to high 
fire operation. If a W1 and W2 call for heat is present, then the 
furnace will remain on high fire operation until the W2 call for 
heat is satisfied. 

Automatic staging of a two stage furnace using a single stage 
thermostat is possible. To achieve automatic staging of a two 
stage furnace using a single stage thermostat, cut the 440/GY 
wire that runs from pin 2 of the S3 connector on the (UCB) unit 
control board to P2-4 on the ignition control board. Cut the wire 
1/2" from the S3 mate-n-lock connector. Wire nut or tape off the 
1/2" wire. Attach the other end of the 440/GY wire to the R 
terminal on the UCB, or to the TB1 power strip.

The unit will operate the same as a W1 only call for heat for 10 
minutes. If the call for heat is not satisfied in the 10 minutes, 
then the ICB will move to high fire operation until the W1 call for 
heat has been satisfied.

Gas Heat Operation Errors

During furnace operation, the ICB monitors the flame sense 
circuit, the centrifugal switch, the primary limit switch and the 
roll out switch. If a signal from any of the inputs moves to a fault 
state, then the ICB immediately closes the pilot and main gas 
valves. The ICB will determine the device that is signaling a 
fault and flash a code for that device. A primary limit trip, 
centrifugal switch trip or flame sense fault triggers a temporary 
lock out. An auxiliary limit or a roll out switch trip requires 
intervention to reset the ICB. The UCB also monitors the 
primary limit and gas valve.

Temperature Limits

The primary limit is located such that the temperature 
sensitive switch can sense the temperature of the heat 
exchanger tubes. On single stage models the limit is mounted 
to the condenser partition panel. On two stage models the limit 
is mounted just above the inlet of the heat exchanger tubes on 
the right side. If a primary limit (LS) fault occurs (the primary 
limit opens due to excessive heat exchanger temperature), 
then the ICB will flash the appropriate code (Table 26) and 
monitor the primary limit. The UCB will energize the indoor 
blower and the ICB will energize the draft motor while the 
primary limit is open. When the primary limit closes and the 

call for heat still exists, the ICB will start the ignition sequence 
over and the UCB will de-energize the blower for 45 seconds. 
However, the auxiliary limit is in series with the primary limit 
and it takes first control. If the excessive heat has been high 
enough to cause the auxiliary limit (AUX) to open, then the 
ICB will flash the primary limit code but the furnace will not 
retry ignition during the same call for heat. The auxiliary limit is 
of the manual reset type and is mounted in the upper right 
hand corner of the panel between the burner manifold and the 
flue gas collector box just behind the draft motor. If the 
auxiliary switch has opened, then special attention should be 
paid to the primary limit as it may be faulty as well. However, 
the auxiliary switch is sized such that multiple trips of the 
primary limit due to complete blower failure will cause enough 
heat to build up and trip the auxiliary.

If the primary limit opens three times within one hour, then the 
UCB will lock on the indoor blower and flash a fault code 
(Table 25).

Gas Valve

The UCB monitors the gas valve (GV). Any time the UCB senses 
voltage at the GV without a call for heat for a continuous five-
minute period, the UCB will lock on the indoor blower and a flash 
code on the UCB is initiated (Table 25). When the UCB no longer 
senses voltage at the GV the UCB will de-energize the indoor 
blower after the expiration of the indoor blower heating off delay.

If the voltage has been sensed at the GV for at least 15 
seconds during the fan on delay for heating and the UCB no 
longer senses voltage at the GV (W1 call for heat removed or 
an ICB fault exists), then the UCB forces the indoor blower on 
for the indoor blower heating off delay.

The gas valve is of the redundant type. If for any reason the 
main gas valve fails in the open position, then the redundant 
valve ahead of the main gas valve will shut off the flow of gas to 
both the pilot and main gas valves.

Centrifugal Switch

The centrifugal switch is mounted on the end of the draft motor 
and it is an integral part of the motor assembly. On a call for 
heat, the ICB checks the centrifugal switch (CS) for open state 
before it energizes the draft motor. If it is closed, then the ICB 
will lock out the furnace and flash a code (Table 26). If open, 
then the ICB will energize the draft motor and verify that the 
switch closes before initiating the purging and ignition 
sequence. If at any time during furnace operation the 
centrifugal switch opens, then the ICB will de-energize the pilot 
and main gas valves and monitor the centrifugal switch. If the 
centrifugal switch closes and the call for heat still exists, then 
the ICB will retry the purging and ignition sequence.

Rollout Switch

This temperature sensitive switch is located in the burner 
vestibule just above the right hand side of the burner assembly. 
In the event of the flame spilling out into the burner manifold 
area the rollout switch will open, the ICB will close both the 

Gas Valve

Gas main

Main valve

To main burner

Redundant valve

To pilot burner

Summary of Contents for YORK ZR Series

Page 1: ...lection 39 16 Indoor Blower Specifications Belt Drive 39 17 Power Exhaust Specifications 40 18 Additional Static Resistance 41 19 Electric Heat Limit Setting 44 20 Electric Heat Anticipator Setpoints...

Page 2: ...ng filters Observe all precautions in the literature labels and tags accompanying the equipment whenever working on air conditioning equipment Be sure to follow all other applicable safety precautions...

Page 3: ...ny applicable local state and national codes including but not limited to building electrical and mechanical codes The furnace and its individual shut off valve must be disconnected from the gas suppl...

Page 4: ...4 5 X Options 3 5 Y Options 4 5 Z Options 3 4 5 1 Disconnect 2 Non Pwr d Conv Outlet 3 Smoke Detector S A 4 Smoke Detector R A 5 Pwr d Conv Outlet Options SS Drain Pan Configuration Options not requi...

Page 5: ...cal gas utility requirements In Canada 1 Canadian Electrical Code CSA C22 1 2 Installation Codes CSA B149 1 3 Local plumbing and waste water codes and 4 Other applicable local codes Refer to unit appl...

Page 6: ...High efficiency compressor Knockout for side gas supply entry Simplicity control board Copper tube aluminum fin condensing coil Full perimeter baserails with forklift slots and lifting holes Table 1 Z...

Page 7: ...unit operation Rigging And Handling Exercise care when moving the unit Do not remove any packaging until the unit is near the place of installation Rig the unit by attaching chain or cable slings to t...

Page 8: ...ipping Operating X Y A B C D A B C D E F 036 3 0 580 575 40 20 132 125 155 164 89 85 82 102 106 110 048 4 0 590 585 40 20 134 127 158 167 90 87 84 104 108 112 060 5 0 595 590 40 20 135 128 159 168 91...

Page 9: ...03134 YIM E 0311 Johnson Controls Unitary Products 9 Figure 5 ZR036 060 Cooling Only Electric Heat Front View Physical Dimensions Figure 6 ZR036 060 Cooling Only Gas Heat Front View Physical Dimension...

Page 10: ...conomizer 36 With Economizer or Fixed Air Motorized Damper Left Side Filter Access 24 Less Economizer 36 With Economizer Right Side Cond Coil 24 Below Unit1 1 Units may be installed on combustible flo...

Page 11: ...oof Curb Table 5 ZR036 060 Utilities Entry Hole Opening Size Dia Used For A 7 8 KO1 1 Opening in the bottom to the unit can be located by the slice in the insulation Control Wiring2 2 Do not remove th...

Page 12: ...e 11 Condensate Drain Compressors The scroll compressor used in this product is specifically designed to operate with R 410A Refrigerant and cannot be interchanged The compressor also uses a polyolest...

Page 13: ...the same minimum gauge as the replaced wire A disconnect must be utilized for these units Factory installed disconnects are available If installing a disconnect field supplied or York International s...

Page 14: ...ostat should be located on an inside wall approximately 56 inch above the floor where it will not be subject to drafts sun exposure or heat from electrical fixtures or appliances Follow the manufactur...

Page 15: ...L BOARD TERMINAL STRIP 24 VOLT TRANSFORMER C C PROGRAMMABLE THERMOSTAT ONLY R G R G Y1 Y1 Y2 W1 W2 Y Y2 Minimum wire size of 18 AWG wire should be used for all field installed 24 volt wire 2 STAGE THE...

Page 16: ...460 3 60 6 4 45 0 10 0 1 3 2 6 0 0 None 11 9 15 E07 6 8 1 8 2 13 5 15 E10 10 1 1 12 1 18 4 20 E15 13 6 2 16 4 23 7 25 E20 19 5 2 23 5 32 6 35 575 3 60 5 4 38 0 8 5 1 3 2 0 0 0 None 9 8 15 E10 10 6 1...

Page 17: ...5 90 230 3 60 17 6 123 0 27 5 2 3 5 2 0 0 None 29 5 40 E05 5 3 1 12 7 29 5 40 E07 7 5 1 18 0 29 5 40 E10 10 6 1 25 5 38 4 45 E15 15 9 2 38 2 54 3 60 E20 21 2 2 51 0 70 2 80 E30 29 6 2 71 2 95 5 100 46...

Page 18: ...60 6 4 45 0 10 0 1 3 2 6 0 0 None 11 9 15 E07 6 8 1 8 2 13 5 15 E10 10 1 1 12 1 18 4 20 E15 13 6 2 16 4 23 7 25 E20 19 5 2 23 5 32 6 35 575 3 60 5 4 38 0 8 5 1 3 2 0 0 0 None 9 8 15 E10 10 6 1 10 2 1...

Page 19: ...60 9 6 70 0 15 0 1 3 4 1 0 0 None 17 4 25 E07 6 8 1 8 2 17 4 25 E10 10 1 1 12 1 20 3 25 E15 13 6 2 16 4 25 6 30 E20 19 5 2 23 5 34 4 35 E30 28 8 2 34 6 48 4 50 575 3 60 7 5 53 0 11 7 1 3 3 6 0 0 None...

Page 20: ...15 5 26 9 35 E10 8 0 1 22 2 35 3 40 E15 11 9 2 33 0 48 8 50 E20 15 9 2 44 1 62 7 70 230 3 60 12 8 95 0 20 0 2 3 6 0 0 0 None 24 3 30 E05 5 3 1 12 7 24 3 30 E07 7 5 1 18 0 30 1 35 E10 10 6 1 25 5 39 4...

Page 21: ...0 0 None 31 9 40 E05 4 0 1 11 1 31 9 40 E07 5 6 1 15 5 31 9 40 E10 8 0 1 22 2 37 3 45 E15 11 9 2 33 0 50 8 60 E20 15 9 2 44 1 64 7 70 E30 22 2 2 61 6 86 5 90 230 3 60 17 6 123 0 27 5 2 3 7 6 0 0 None...

Page 22: ...45 0 10 0 1 3 2 6 5 0 None 16 9 20 E07 6 8 1 8 2 19 7 20 E10 10 1 1 12 1 24 7 25 E15 13 6 2 16 4 29 9 30 E20 19 5 2 23 5 38 8 40 575 3 60 5 4 38 0 8 5 1 3 2 0 4 0 None 13 8 15 E10 10 6 1 10 2 20 2 25...

Page 23: ...6 0 100 230 3 60 17 6 123 0 27 5 2 3 5 2 10 0 None 39 5 50 E05 5 3 1 12 7 39 5 50 E07 7 5 1 18 0 41 6 50 E10 10 6 1 25 5 50 9 60 E15 15 9 2 38 2 66 8 70 E20 21 2 2 51 0 82 7 90 E30 29 6 2 71 2 108 0 1...

Page 24: ...0 6 4 45 0 10 0 1 3 2 6 5 0 None 16 9 20 E07 6 8 1 8 2 19 7 20 E10 10 1 1 12 1 24 7 25 E15 13 6 2 16 4 29 9 30 E20 19 5 2 23 5 38 8 40 575 3 60 5 4 38 0 8 5 1 3 2 0 4 0 None 13 8 15 E10 10 6 1 10 2 20...

Page 25: ...0 3 60 9 6 70 0 15 0 1 3 4 1 5 0 None 22 4 30 E07 6 8 1 8 2 22 4 30 E10 10 1 1 12 1 26 6 30 E15 13 6 2 16 4 31 8 35 E20 19 5 2 23 5 40 7 45 E30 28 8 2 34 6 54 7 60 575 3 60 7 5 53 0 11 7 1 3 3 6 4 0 N...

Page 26: ...5 39 4 45 E10 8 0 1 22 2 47 8 50 E15 11 9 2 33 0 61 3 70 E20 15 9 2 44 1 75 2 80 230 3 60 12 8 95 0 20 0 2 3 6 0 10 0 None 34 3 45 E05 5 3 1 12 7 35 9 45 E07 7 5 1 18 0 42 6 45 E10 10 6 1 25 5 51 9 60...

Page 27: ...6 10 0 None 41 9 50 E05 4 0 1 11 1 41 9 50 E07 5 6 1 15 5 41 9 50 E10 8 0 1 22 2 49 8 50 E15 11 9 2 33 0 63 3 70 E20 15 9 2 44 1 77 2 80 E30 22 2 2 61 6 99 0 100 230 3 60 17 6 123 0 27 5 2 3 7 6 10 0...

Page 28: ...2 4 3 5 3 5 3 5 4 5 3 5 No stages 1 1 2 2 1 1 2 2 1 1 2 2 Temperature Rise Range F 15 45 45 75 35 70 55 90 25 70 45 75 25 70 45 75 25 55 35 75 20 55 35 75 Gas Limit Setting F Direct Drive 240 170 210...

Page 29: ...1 Fan Size Inch 12 x 10 12 x 10 12 x 10 Type Centrifugal Centrifugal Centrifugal Motor Sheave 1VL44 1VP56 1VL44 1VP56 1VL44 1VP56 Blower Sheave AK64 AK66 AK56 AK61 AK56 AK56 Belt A37 A39 A36 A38 A36...

Page 30: ...Gas Heaters are shipped available for natural gas but can be converted to L P with Kit Model No 1NP0440 or 1NP0485 2 Stage All furnaces meet the latest California seasonal efficiency requirements 1 Ba...

Page 31: ...union must be installed in the gas piping 2 Where required by local codes a manual shut off valve must be installed outside of the unit 3 Use wrought iron or steel pipe for all gas lines Pipe dope sh...

Page 32: ...t and Combustion Air Hood Figure 16 The vent hood is installed by inserting the top flange of the hood into the slotted opening in the access panel and securing in place The products of combustion are...

Page 33: ...ed minimum damper position has been attained Enthalpy Set Point Adjustment The enthalpy set point may now be set by selecting the desired set point shown in the Enthalpy Set Point Adjustment Figure 17...

Page 34: ...er rotation If the blower is rotating backwards the line voltage at the unit point of power connection is misphased See PHASING Belt Tension The tension on the belt should be adjusted as shown in Figu...

Page 35: ...force to one belt at the midpoint of the span as shown Deflection distance of 4mm 5 32 is obtained To determine the deflection distance from normal position use a straight edge from sheave to sheave a...

Page 36: ...point on the appropriate supply air blower performance table Linear interpolation may be necessary 5 Noting the RPM and BHP from step 4 locate the appropriate motor and or drive on the RPM selection t...

Page 37: ...786 0 47 866 0 54 942 0 62 1016 0 71 1087 0 79 1155 0 88 1221 0 98 1284 1 07 1345 1 17 1200 733 0 44 817 0 52 896 0 60 973 0 68 1047 0 76 1118 0 85 1186 0 94 1252 1 03 1315 1 12 1376 1 22 1400 770 0 5...

Page 38: ...ANCE table for additional applications 2 See RPM SELECTION table to determine desired motor sheave setting and to determine the maximum continuous BHP 3 kW BHP x 0 932 0 2 0 4 0 6 0 8 1 0 1 2 1 4 1 6...

Page 39: ...38 349 1401 363 1363 376 1327 390 1286 403 1248 417 1207 430 4 MED HI 1430 263 1384 276 1342 290 1302 303 1259 316 1215 329 1168 343 1114 358 1044 374 3 MED 1287 208 1242 221 1199 234 1155 246 1108 25...

Page 40: ...that velocity pressure will not affect the static pressure readings 3 Using an inclined manometer determine the pressure drop across a dry evaporator coil Since the moisture on an evaporator coil may...

Page 41: ...run time the compressor and condenser fan de energize Otherwise the unit operates the cooling system until the minimum run time for the compressor has been completed After the compressor de energizes...

Page 42: ...e power exhaust operation Motorized Outdoor Air Dampers This system operation is the same as the units with no outdoor air options with one exception When the R to G circuit is complete the motorized...

Page 43: ...system Refer to UNIT CONTROL BOARD FLASH CODES Table 25 Reset Remove the call for cooling by raising thermostat setting higher than the conditioned space temperature This resets any pressure or freeze...

Page 44: ...tch closes a 15 second heat exchanger purging period is completed After this purging period the ICB will simultaneously energize the pilot gas valve and the ignition coil Once the flame sensor senses...

Page 45: ...However the auxiliary limit is in series with the primary limit and it takes first control If the excessive heat has been high enough to cause the auxiliary limit AUX to open then the ICB will flash t...

Page 46: ...on the unit nameplate 2 Set the room thermostat to the off position 3 Turn unit electrical power on 4 Set the room thermostat fan switch to on 5 Check indoor blower rotation If blower rotation is in t...

Page 47: ...ral gas units If gas pressure is outside these limits contact the local gas utility for corrective action Figure 23 Typical Single Stage Gas Valves Figure 24 Typical 2 Stage Gas Valves Manifold Gas Pr...

Page 48: ...dure to replace the assemblies Make sure that burners are level and seat at the rear of the heat exchanger Burner Air Shutter Adjustment Adjust burner shutters so no yellow flame is observed in the he...

Page 49: ...off on internal protection Cancel any thermostat calls and set the fan switch to AUTO Wait for the internal overload to reset Test again when cool 5 If M2 is not pulled in check for 24 volts at the M...

Page 50: ...oom thermostat check for the following a 24 volts at the thermostat Y1 terminal b Proper wiring between the room thermostat and the UCB i e Y1 to Y1 Y2 to Y2 c Loose wiring from the room thermostat to...

Page 51: ...lock out compressor operation when the LAS set point is reached For units without factory installed or with field installed economizers the UCB allows compressor operation all the time This programmin...

Page 52: ...0 480 500 120 130 140 150 160 170 Suction Pressure psig Discharge Pressure psig 65 F Outdoor 75 F Outdoor 85 F Outdoor 105 F Outdoor 115 F Outdoor 95 F Outdoor 5 Ton Operating Pressure 220 240 260 280...

Page 53: ...ol box and the ICB and repair as necessary If the control voltage is present then verify the cleanliness of the harness and the ICB connector clean if necessary and reconnect the wiring harness to the...

Page 54: ...is weak or unstable in the flame sensor area then verify the gas inlet pressure If gas inlet pressure is above the minimum inlet pressure stated on unit data label then adjust the pilot pressure per...

Page 55: ...the draft motor operates and the furnace lights but the supply air blower motor does not energize after a short delay the room thermostat fan switch is in AUTO position 1 Place the thermostat fan swit...

Page 56: ...te 1 Make the same checks and adjustment as described in PILOT CHECKOUT on page 48 2 Check the supply pressure as described in POST START CHECK LIST on page 47 Make adjustments as necessary 3 Make sur...

Page 57: ...80 second delay OFF to the program Electric Heat Press and release the COMM SETUP and LAST ERROR buttons at the same time The control flashes twice on the LED as the control writes a 0 second ON and a...

Reviews: