www.johnnyseeds.com
26
m. Cut two 1" x 4" boards to span the
insides of each of the doors as a bit of
extra bracing. Level these with another
piece of board as shown to the right.
n. Cut to length as needed and install
wire channel around the open holes in
the doors, around the door frame, and
along both sides of the endwall
baseboard.
5.
Skinning the Endwall
:
a. The plastic used to cover this
tunnel should be a 6 mil
greenhouse film that is 32'
wide. Start by cutting a piece
off the roll that is 12.5' long.
b. Lay the cut panel of plastic
over the endwall so that one
of the long edges (preferably
a factory cut end) is along the
ground and all edges of the
endwall are overlapped with
extra plastic. There may be
manufacturer's writing on the
plastic. You can use that as
an aid to level the plastic
across the endwall.
4.m.
4.m.
4.n.
4.n.
4.n.
5.b.
5.c.
7617.999 Rev 06/21/2021 | AL, JG, ms