OPERATOR’S MANUAL JDI-15DP
OPERATOR’S MANUAL JDI-15DP
Assembly:
Operation:
1. Wheel Assembly:
a. Insert the casters into caster brackets.
b. Place lock washer over caster threaded stud.
c. Place nut onto threaded stud.
d. Tighten.
(See Fig. 1)
Operation:
1. Remove the cap A and fill the tank with oil no more than the
maximum level shown on the level gauge indicator B.
(See Fig. 2)
Pressure Gauge
Oil Gun
Handle
Safety Valve
Level Indicator
Caster
Cap
Wheels
Fig. 1
2. Replace the cap and tighten.
(See Fig. 3)
3. Close air valve C.
(See Fig. 4)
4. Open valve C to pressurize the tank 45 psi (maximum of 80 psi).
Monitor the pressure using pressure gauge E.
(See Fig. 5)
NOTE: A safety valve F is installed to prevent over pressurization of the
tank. The safety valve is calibrated at 90 psi.
6. To dispense fluids, squeeze the hanld on the fluid delivery gun G.
(See Fig. 6)
Fig. 2
Fig. 3
Fig. 4
Fig. 5
Fig. 6