05.19M142J3
6
6
STORAGE
At the end of the season, the following steps should be taken to maintain and protect your air seeder throughout the off-season.
Prop lids open 25 mm - 30 mm to relieve pressure on the lid seals.
Open the bottom tray.
Clean thoroughly. Remove all particles of grain, fertiliser etc.
Worn or damaged parts should be replaced or repaired where necessary.
Relieve weight off tyres.
Lubricate all grease fittings.
Remove flexible plumbing from the implement and store it dry and out of sunlight.
Summary of Contents for 6M Airdrill
Page 1: ...JOHN SHEARER 6M AS2400 Tyne Airseeder 6M AS2400 DDO Airseeder Operators Manual 142J3...
Page 4: ......
Page 20: ...09 13M138J1 18...
Page 25: ...09 13M138J1 23...
Page 26: ...05 19M142J3 24 24 NOTES...
Page 27: ...09 13M138J1 25...
Page 28: ...05 19M142J3 26 26 NOTES...
Page 29: ...05 19M142J3 27 27...
Page 30: ...05 19M142J3 28 28 NOTES...
Page 31: ...05 19M142J3 29 29...
Page 32: ...05 19M142J3 30 30 NOTES...
Page 36: ...05 19M142J3 34 34 DOUBLE DISC OPENER ASSEMBLY SPRING...
Page 38: ...05 19M142J3 36 36 DOUBLE DISC OPENER DETAIL SECTION VIEWS...