05.19M142J3
13
13
SETTING UP
Congratulations on the purchase of your new Air Drill.
This manual has been prepared to assure the proper setup,
operation and trouble-free service.
After reading this manual, keep it in the carrier provided on the
implement for quick and easy reference should any question
arise concerning operation or service.
Your AIR SEEDER is designed to give maximum service life,
but a routine lubrication and maintenance schedule must be
followed as shown on the lubrication chart (see page 20)
SETTING UP
– TRAILED IMPLEMENT
IMPLEMENT LEVELLING “FRONT TO REAR”.
Adjust hitch link to level implement “front to rear” at working
position. Extend the link to increase the depth of working of
the rear tynes. Set the Disc Drill with the grain and fertiliser
box suppo
rt “level” in the working position.
IMPLEMENT LEVELING “SIDE TO SIDE” / DEPTH
ADJUSTMENT
Set the adjusting screws on each side.
TURNING
Avoid turning sharply with tynes/discs in the ground. Lift the
machine out of the ground at corners and sow headlands
separately to avoid oversowing.
SOWING RATES
Select sowing rates as per the sowing chart. N.B. This chart is to
be used as a guide only.
The new AS2400lt air seeder is sowing through the electric
motor. After calibration, the sowing rate is automatically
controlled by the John Shearer App.
Check sowing rate for a reference as follows:
The sowing rate chart is based on an effective wheel rolling
perimeter of 2568mm. That is 649 revolutions of the drive wheel
correspond to 1 hectare.
Summary of Contents for 6M Airdrill
Page 1: ...JOHN SHEARER 6M AS2400 Tyne Airseeder 6M AS2400 DDO Airseeder Operators Manual 142J3...
Page 4: ......
Page 20: ...09 13M138J1 18...
Page 25: ...09 13M138J1 23...
Page 26: ...05 19M142J3 24 24 NOTES...
Page 27: ...09 13M138J1 25...
Page 28: ...05 19M142J3 26 26 NOTES...
Page 29: ...05 19M142J3 27 27...
Page 30: ...05 19M142J3 28 28 NOTES...
Page 31: ...05 19M142J3 29 29...
Page 32: ...05 19M142J3 30 30 NOTES...
Page 36: ...05 19M142J3 34 34 DOUBLE DISC OPENER ASSEMBLY SPRING...
Page 38: ...05 19M142J3 36 36 DOUBLE DISC OPENER DETAIL SECTION VIEWS...