Fridge freezer user guide
22
Water Tube Rubber Washer
3 Connect the fridge freezer to the power supply and switch
it on.
Caution - You must wait at least 8 hours
after installing the fridge freezer before
switching on to allow for oil in the
compressor to settle.
4 Press and hold the
water button
on the control panel
for two to three minutes until the water tank is full and
waters starts to
fl
ow from the dispenser.