39
Step1:
Please connect the wire of DC according to the following steps:
Operation Instruction
Operation Demonstration
1. Connect DC wire and cold terminal
(SC35-8
)
firmly by crimping plier.
Step2:
Through the PV waterproof terminal on the terminal cover, fix the DC wire (PV +,
PV -) on the terminal, pay attention to the positive and negative poles shouldn’t be
connected reversely, and ensure that the circuit breaker at the DC side of the system is
in the off state.
Figure6-4 PV side electrical connection
Summary of Contents for JNP22KH-V5
Page 23: ...23 4 Inverter factory number ...
Page 60: ...60 8 1 3 LCD Display Interface Overview Figure8 2 LCD diagram 1 ...
Page 61: ...61 ...