
168
Boom
Lift
Models X17JPLUS
MAINTENANCE
MUX17JP021602
In
the
case
of
AGM
(Absorbed
Glass
Mat)
the
battery
not
require
any
maintenan
‐
ce.
In
the
case
of
lead
acid
battery
maintenance
is
reduced
and
in
most
cases
not
ne
‐
cessary.
However,
if
the
electrolyte,
with
the
machine
on
a
level
surface,
is
below
the
minimum
allowed
level
(MIN.),
it
is
possible
to
top
up
by
removing
the
sea
‐
ling
caps
and
adding
distilled
water
without
exceeding
the
maximum
level
(MAX.).
When
the
battery
cannot
accumulate
electric
energy
any
longer,
replace
it
with
a
new
one
having
the
same
characteristics.
See
the
specifications
table
on
the
bat
‐
tery.
Follow
the
steps
below
to
replace:
• With
the
machine
off
and
engine
key
in
the
OFF
position
disconnect
the
bat
‐
tery
switch;
• Disconnect
the
battery
terminals,
always
starting
from
the
negative
pole
(
‐
).
• Remove
the
battery
and
install
the
new
one;
• Reconnect
the
cables,
always
starting
from
the
positive
pole
(+).
Before
working
on
the
battery,
ALWAYS
disconnect
the
battery
cut
‐
out
swi
‐
tch.
If
the
machine
is
going
to
remain
unused
for
more
than
one
month,
it
is
ad
‐
visable
to
insulate
the
battery.
The
batteries
must
be
disposed
of
in
compliance
with
the
specific
regulations
in
force.
Summary of Contents for X17JPLUS
Page 2: ......
Page 8: ...MUX17JP021602 6 Boom Lift Models X17JPLUS ...
Page 34: ...32 Boom Lift Models X17JPLUS TECHNICAL INFORMATIONS MUX17JP021602 ...
Page 162: ...160 Boom Lift Models X17JPLUS MAINTENANCE MUX17JP021602 ...
Page 192: ...190 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 16 WIRING DIAGRAM ...
Page 193: ...WIRING DIAGRAM 191 MUX17JP021602 Boom Lift Models X17JPLUS Fig 172 Petrol ...
Page 194: ...192 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 Fig 173 Diesel ...
Page 195: ...WIRING DIAGRAM 193 MUX17JP021602 Boom Lift Models X17JPLUS Fig 174 Lithium ...
Page 197: ...WIRING DIAGRAM 195 MUX17JP021602 Boom Lift Models X17JPLUS Worldwide locations ...
Page 198: ...196 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 ...
Page 199: ......