Index
1
31200345
A
Additional Checks
.............................. 8-1
Approved Platforms
........................... 5-1
Auxiliary Power System
Test
.............................................. 8-1
B
Battery
............................................... 7-8
Boom Joystick
.................................... 3-4
C
............................................ 5-2
Chemical Hazards
............................... 1-9
Control Operation
.............................. 4-3
............................................. 3-2
D
............................................... 2-3
........................................ 9-2
E
Electrical Hazards
............................... 1-2
Emergency Lowering of Boom
Emergency Operation
Emergency Procedures
F
Fall Hazard
......................................... 1-8
.......................................... 7-4
G
................................................ 2-10
General Maintenance
H
Hazard Classification System
I
Incident Notification
........................... 6-3
Indicator Panel
................................... 3-3
Installation
......................................... 5-3
L
Lanyard Anchorage Points
Lifting Personnel
.................................1-5
Load Falling Hazard
............................1-4
Lubrication and Maintenance
M
Minimum Approach Distance
N
Normal Engine Operation
O
Operational Check
..............................2-9
Operator Maintenance Instructions
P
Performance
.......................................9-1
Pinch Points and Crush Hazards
Platform
.............................................5-1
Platform Extension
............................2-12
Platform Operation
.............................4-2
Power/Emergency Stop Switch
Pre-Operation Check and Inspection
Preparing Machine for Platform
Operation
...........................................4-1
S
Safety Decals
......................................2-3
Safety Practices
...................................1-1
Safety Signal Words
............................1-1
Service and Maintenance Schedule
10 Hour
.........................................7-2
1000 Hour
.....................................7-2
50 Hour
.........................................7-2
.....................................9-1
Starting the Engine
.............................4-2
Index
Summary of Contents for 3513PS
Page 2: ......
Page 10: ...Table of Contents iv 31200345...
Page 20: ...Section 1 General Safety Practices 1 10 31200345 This Page Intentionally Left Blank...
Page 34: ...Section 2 Pre Operation and Inspection 2 14 31200345 This Page Intentionally Left Blank...
Page 46: ...Section 5 Platform 5 4 31200345 This Page Intentionally Left Blank...
Page 50: ...Section 6 Emergency Procedures 6 4 31200345 This Page Intentionally Left Blank...
Page 53: ...Section 7 Lubrication and Maintenance 7 3 31200345 This Page Intentionally Left Blank...
Page 60: ...Section 8 Additional Checks 8 2 31200345 This Page Intentionally Left Blank...
Page 64: ...Section 9 Specifications 9 4 31200345 This Page Intentionally Left Blank...
Page 68: ...Inspection Maintenance and Repair Log Date Comments...
Page 69: ......