Section 2 - Pre-Operation and Inspection
2-11
31200345
2.6
LANYARD ANCHORAGE POINTS
• Attach lanyard to one of the lanyard anchorage points.
• Fixed Platform - Attach one lanyard per lanyard anchorage point. DO NOT attach more
than one lanyard per lanyard anchorage point.
• Extendable Platform - Attach two lanyards per lanyard anchorage point. DO NOT
attach more than two lanyards per lanyard anchorage point.
O
Z
1290
Summary of Contents for 3513PS
Page 2: ......
Page 10: ...Table of Contents iv 31200345...
Page 20: ...Section 1 General Safety Practices 1 10 31200345 This Page Intentionally Left Blank...
Page 34: ...Section 2 Pre Operation and Inspection 2 14 31200345 This Page Intentionally Left Blank...
Page 46: ...Section 5 Platform 5 4 31200345 This Page Intentionally Left Blank...
Page 50: ...Section 6 Emergency Procedures 6 4 31200345 This Page Intentionally Left Blank...
Page 53: ...Section 7 Lubrication and Maintenance 7 3 31200345 This Page Intentionally Left Blank...
Page 60: ...Section 8 Additional Checks 8 2 31200345 This Page Intentionally Left Blank...
Page 64: ...Section 9 Specifications 9 4 31200345 This Page Intentionally Left Blank...
Page 68: ...Inspection Maintenance and Repair Log Date Comments...
Page 69: ......