![JLG 3124288 Manual Download Page 39](http://html1.mh-extra.com/html/jlg/3124288/3124288_manual_2020135039.webp)
SECTION 5 - SERVICE - (LE, MRT, RTS, ES, RT)
3124288
– JLG Lift –
5-1
SECTION 5. SERVICE - (LE, MRT, RTS, ES, RT)
5.1 DESCRIPTION
The system consists of the LSS Module, four Shear Pin
Load Cells (sensors), Wire Harness, and various brackets
and fasteners. The LSS Module is mounted beneath the
platform on a bracket. The Shear Pin Load Cells mount
between the platform and the arm structure in such a way
that all support force for the platform is applied through
them (for measurement). The four Shear Pin Load Cells
plug directly into the LSS Module. The Wire Harness con-
nects the LSS Module to the Host Control System.
1
2
3
4
6
5
NOTE ORIENTATION OF PIN ARROW,
POINTED AWAY FROM PLATFORM
8
7
1. Load Cell (Typical 4 Corners)
2. System Interface - Power & Digital - J1
3. System Interface Communication - J2
4. Indicator Light
5. Rear Right Load Cell - J8
6. Rear Left Load Cell - J7
7. Front Right Load Cell - J6
8. Front Left Load Cell - J5
Figure 5-1. Load Sense Module
Go to Discount-Equipment.com
to order your parts