![JLA D30 Phase 7 Non-Coin Installation Manual Download Page 51](http://html.mh-extra.com/html/jla/d30-phase-7-non-coin/d30-phase-7-non-coin_installation-manual_2019820051.webp)
47
SECTION IX
PROCEDURE FOR FUNCTIONAL CHECK
OF REPLACEMENT COMPONENTS
1. Microprocessor Controller (Computer) Board
a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish
power to the dryer.
b. Start the drying cycle.
c. Verify that the applicable indicator lights on the back side of the microprocessor controller (computer)
board are lit. (Refer to the
illustration below
.)