background image

STEP 7: 

With the hardware from  

STEP 4

. From 

under neath, attach the Stealthbox to the bracket. 
Secure tightly using an open end wrench. 

STEP10:            *CAUTION*

                            

Before drilling, make sure that you are not going to 
be drilling into any gas lines, brake lines, transmission 
lines, electrical wiring, transfer case(4x4 vehicles) or 
anything else that might cause a reduction in your 
weekly pay. Always wear eye protection when drill-
ing.
With the use of a 1/2” drill bit and drill. Drill out 
the jack bracket and floor. Use the hole of the jack 
bracket as the drilling guide, as pictured. 

Cont.

From 

Previous 

Page

Continued on Next Page

 ➔

STEP 8: 

With the supplied hardware, attach the 

jack bracket to the front of the Stealthbox. 

STEP 11: 

Attache the jack bracket to the floor, 

using the supplied hardware. 
Place a 3/8” lock washer and 3/8’ flat washer onto 
the 3/8”-16 x 2 bolt. 
From inside the truck, slide the bolt through the 
hole of the jack bracket and floor. 
From under the truck, place the 3/8” fender washer, 
3/8” flat washer and 3/8”-16 nut onto the protrud-
ing bolt. 
Secure tightly.  

STEP 12: 

On the back side of the plastic jack 

cover, there are two plastic guides. 
Grind these guides off. 
The picture above shows the guides already ground 
off.
  

        

STEP 9: 

From under the truck, remove the heat 

shield. 

SB-GM-CLREXT/10W3v3, JL AUDIO, Inc 2010

Sheet SKU#011195  Revision 09.08.2015

Page 2

w w w. j l a u d i o . c o m

Reviews: