JK2830 Operation Manual Chapter 5 Execute LCR operation and some examples
Chapter 6
Performance and Test
6.1
Test function
6.1.1
Parameter and symbol
C
:
capacitance
L
:
Inductance DCR: DC resistance
R
:
resistance
Z
:
impedance
Y
:
Admittance
X
:
reactance
B
:
susceptance G
:
Conductance
D
:
dissipation
:
phase angle Q
:
Quality factor
6.1.2
Test combination
Parameters described above are combined in the following modes:
Primary parameter
Z
,
Y
L
,
C
R G
Secondary parameter
(
deg phase
)
,
(
rad radian
)
D
,
Q
,
R
S
,
R
P
,
G X B
6.1.3
Mathematical operation
Operation between the measurement value and the programmable nominal value:
absolute deviation ∆ABS and percent deviation ∆%.
6.1.4
Equivalent mode
Series and parallel
6.1.5
Range
Auto, Manual (Hold, increase and decrease)
6.1.6
Trigger
Internal, external and manual
Internal: Test DUT constantly and display the result
Manual: Press TRIGGER to test once then the result will be displayed.
External: After HANDLER receivi
ng “start” signal
,
perform a measurement and
output test result.
54