GENERAL INSTALLATION INSTRUCTIONS 

ROUGH-IN: 

Test fit the tub and verify dimensions. Carefully level the unit using shims if needed. 

SITE PREPERATION: 

o

The site should be cleared of debris and vacuumed. This will ensure that the bathtub is leveled properly.

o

Check if the floor is leveled and solid. The level should be in a range that can be compensated for using shims. An

average sized bathtub can weigh as much as 1000 lbs when full, the floor must be able to support this weight.

o

An opening of 6” x 6" should be provided in the floor for the bathtub dr

ain and overflow. Make sure there are no

obstructions in this space.

o

The plumbing rough-in for both the drain and the supply lines should be completed by a licensed plumber before the

bathtub is moved into its final position.

PREPARATIONS: 

Before installing a new DADOquartz® bathtub, we strongly recommend following the installation check list and hiring a 

certified plumber to handle the installation.  

o

Visually inspect the bathtub to make sure it has not been damaged during transport. 

In case of damage, do not

proceed with the installation.

o

Make sure the bathtub is the model that you ordered, that its dimensions are correct, and that the location of the

drain corresponds to the plans.

o

To protect the bathtub during installation, cut a piece cardboard or other protective material and place it in the

bottom of the bathtub.

© 2019 Jetta Corporation. All rights reserved. REV 04/2019

WWW.JETTACORP.COM

 

1(800) 288-7771

 

Summary of Contents for DADOquartz Series

Page 1: ...poration All rights reserved REV 04 2019 WWW JETTACORP COM 1 800 288 7771 INSTALLATION INSTRUCTIONS JETTA CORPORATION PAGE 1 INSPECTION INSTALLATION INSTRUCTIONS DADOquartz COLLECTION 800 288 7771 WWW...

Page 2: ...ENTS GENERAL INSTALLATION INSTRUCTIONS 3 INSPECTION 3 GENERAL INSTALLATION INSTRUCTIONS 3 ROUGH IN 4 SITE PREPERATION 4 PREPARATIONS 4 FREESTANDING INSTALLATION INSTRUCTIONS 5 2019 Jetta Corporation A...

Page 3: ...thoroughly for accuracy or damage o Check to ensure the bathtub is the unit you ordered and that its dimensions and drain position correspond to your plans o To prevent scratches always protect the s...

Page 4: ...this space o The plumbing rough in for both the drain and the supply lines should be completed by a licensed plumber before the bathtub is moved into its final position PREPARATIONS Before installing...

Page 5: ...e place to install floor drain according to guidelines Reposition the bathtub and ensure that the trace lines are followed 2 Drill a 4 hole in your wooden subfloor or leave a 6 x 6 open space in your...

Page 6: ...channel lock plier 12 Apply provided lubricant inside the Drain kit Please only proceed with this step once the pressure test has been performed if needed 13 Affix the appropriate tailpiece to the wa...

Page 7: ...e Drain Kit 15 With caution slowly insert the bath tub tailpiece into the Drain Kit 17 Water test the bathtub for leaks If unit is within the limited factory warranty contact Jetta Corporation at 800...

Reviews: