GENERAL INSTALLATION INSTRUCTIONS
ROUGH-IN:
Test fit the tub and verify dimensions. Carefully level the unit using shims if needed.
SITE PREPERATION:
o
The site should be cleared of debris and vacuumed. This will ensure that the bathtub is leveled properly.
o
Check if the floor is leveled and solid. The level should be in a range that can be compensated for using shims. An
average sized bathtub can weigh as much as 1000 lbs when full, the floor must be able to support this weight.
o
An opening of 6” x 6" should be provided in the floor for the bathtub dr
ain and overflow. Make sure there are no
obstructions in this space.
o
The plumbing rough-in for both the drain and the supply lines should be completed by a licensed plumber before the
bathtub is moved into its final position.
PREPARATIONS:
Before installing a new DADOquartz® bathtub, we strongly recommend following the installation check list and hiring a
certified plumber to handle the installation.
o
Visually inspect the bathtub to make sure it has not been damaged during transport.
In case of damage, do not
proceed with the installation.
o
Make sure the bathtub is the model that you ordered, that its dimensions are correct, and that the location of the
drain corresponds to the plans.
o
To protect the bathtub during installation, cut a piece cardboard or other protective material and place it in the
bottom of the bathtub.