JETMASTER (VIC) Pty Ltd
ACN 005 872 159 ABN13 659 821 337
444 Swan Street Richmond 3121
Phone: (03) 9429 5573 Fax: (03) 9427 0031
Email: [email protected] Web: www.jetmastervic.com.au
V-JOINT TO PLASTERBOARD & WHITE INSULATION BOARD, BUTT JOIN EACH AND BACK FILL WITH BASE COAT.
OVERLAY JOIN WITH FIBREGLASS TAPE AS FIRST JOINT, THEN TROWEL BASE AND TOP COAT OVER.
NOTE
- Unit must be installed (and gas connected) prior to plaster sheeting.
• Position unit into framed opening with minimum clearances as per specifications on following pages. Frame opening
height is from the bottom of unit. This unit is designed to be raised from the floor.
• Run flues in accordance with the options in the installation manual.
• Butt join plasterboard and white insulation board at top of heater. USING ONLY FIBREGLASS TAPE finish insulation
board to plasterboard as per normal plasterboard procedures. Ensure that top coat finish extends down to top of
heater, as indicated in diagram below. Insulation board will remain exposed as part of the finished plaster face.
• Unit should always be operated with External Fan in the ON position. Failure to run the fan may result in hairline cracks
appearing in the plaster above the unit.
Owner’s Manual
Care and Operation
H t & Gl MEZZO 1000 AU MEZZO 1300 AU MEZZO 1300ST AU MEZZO 1600 AU O
’ M
l 2304 971 R C 3/15
ADDENDUM
PLEASE NO
TE
ON THE FOLLOWING MODELS:
MEZZO-1000-AU / MEZZO-1300-AU / MEZZO-1600-AU
1. FANS MUST BE RUN AT ALL TIMES!
2.
RUNNING HEAT ZONE FANS IS
OPTIONAL
Owner’s Manual
Care and Operation
H t & Gl MEZZO 1000 AU MEZZO 1300 AU MEZZO 1300ST AU MEZZO 1600 AU O
’ M
l 2304 971 R C 3/15
ADDENDUM
PLEASE NO
TE
ON THE FOLLOWING MODELS:
MEZZO-1000-AU / MEZZO-1300-AU / MEZZO-1600-AU
1. FANS MUST BE RUN AT ALL TIMES!
2.
RUNNING HEAT ZONE FANS IS
OPTIONAL
JM-155 (10/15)