Installation General

Pipe Fittings 

All pipe fittings are made via 22mm compression 
fittings directly to the unit. The fittings are threaded 
3/4”BSP male parallel, should threaded pipe 
connections be required.  

Cold Feed

A 22mm cold water supply is recommended, however, 
if a 15mm (1/2”) supply exists, which provides sufficient 
flow, this may be used (although more flow noise 
may be experienced). 

A stopcock or servicing valve should be incorporated 
into the cold water supply to enable the cylinder and 
its associated controls to be isolated and serviced.

Cold Water Combination Valve Assembly

The inlet combination valve can be connected 
anywhere on the cold water mains supply prior to 
the unvented cylinder. There is no requirement to 
site it close to the unit, it can be located at a point 
where the mains supply enters the premises if this 
is more convenient (see Fig 05, page 11). The cold 
water combination valve is installed as a complete 
one-piece unit. The valve incorporates the pressure 
reducer, strainer, expansion valve and check valve. 
Ensure that the valve is installed with the direction 
of flow arrows pointing in the correct direction. No 
other valves should be placed between the cold 
water combination valve and the cylinder. The 
expansion relief valve should be installed with the 
discharge pipework in either the horizontal position 
or facing downwards, if fitted inverted, debris may 
be deposited on the seat and cause fouling of the 
seat. A Balanced cold water port available

Drain Tap

A suitable drain tap should be installed in the cold 
water supply to the cylinder between the expansion 
valve (see Fig. 05, page 11) and the heater at a lower 
level as possible. It is recommended that the outlet 
point of the drain pipework be at least 1 metre 
below the level of the heater (this can be achieved 
by attaching a hose to the drain tap outlet spigot).

Secondary Circulation

If secondary circulation is required it is recommended 
that it be connected to the cylinder as shown

 (see 

Fig. 06, page 11) v

ia a swept tee joint into the cold 

feed to the unit. A swept tee joint is available as an 
accessory (order code no. 5133565).

The secondary return pipe should be in 15mm pipe 
and incorporate a check valve to prevent backflow. 
A suitable WRAS approved circulation pump will be 
required. On large systems, due to the increase in 
system water content, it may be necessary to fit an 
additional expansion vessel to the secondary circuit. 
This should be done if the capacity of the secondary 
circuit exceeds 10 litres.
Pipe capacity (copper):
15mm O.D. = 0.13 l/m (10 litres = 77m)
22mm O.D. = 0.38 l/m (10 litres = 26m)
28mm O.D. = 0.55 l/m (10 litres = 18m)

Outlet

The hot water outlet is a 22mm compression fitting 
located at the top of the cylinder. Hot  water distribution 
pipework should be 22mm pipe with short runs of 
15mm pipe to terminal fittings such as sinks and 
basins. Pipe sizes may vary due to system design.

Figure 02: Cold Water Combination Valve Assembly

Expansion valve
(8 bar)

Cold mains 
connection
(22mm)

Expansion valve
outlet (15mm)

Outlet connection
(22mm)

Direction of
flow

Balanced take
 off port

Pressure reducing
valve cartridge
(3.0 bar)

Summary of Contents for 120i

Page 1: ...alve assembly Tundish 2 Port motorised valve Compression nuts olives Immersion heater spanner Installation servicing instructions Guarantee card IMPORTANT Please read understand all these instructions...

Page 2: ...stallation which must be carried out by a competent plumbing and electrical installer in accordance with Building Regulation G3 The Building Standards Scotland Regulations 1990 or The Building Regulat...

Page 3: ...ns with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervisory or instruction concerning use of the appliance in a safe way and underst...

Page 4: ...ll be supplying both the hot and cold water requirements simultaneously It is recommended that the maximum water demand is assessed and the water supply checked to ensure this demand can be satisfacto...

Page 5: ...old water port available Drain Tap A suitable drain tap should be installed in the cold water supply to the cylinder between the expansion valve see Fig 05 page 11 and the heater at a lower level as p...

Page 6: ...mensions Model Reference Dimensions mm A B 120 Ind 931 616 150 Ind 1114 800 170 Ind 1241 927 210 Ind 1499 1184 250 Ind 1752 1379 300 Ind 2065 1694 315 A 354 B Hot Outlet T P Valve Cold Inlet Primary R...

Page 7: ...30 2 34 8 37 7 46 7 57 9 45 min 25 0 28 8 32 3 34 2 41 7 51 0 Coil rating kW 15l min 13 1 16 2 13 7 14 3 14 8 13 0 30l min 16 3 16 3 17 1 17 3 17 4 15 9 45l min 17 6 17 7 18 8 19 1 19 0 17 5 Pressure...

Page 8: ...undish 3 54 The tundish should be vertical located in the same space as the unvented hot water storage system and be fitted as close as possible to and lower than the valve with no more than 600mm of...

Page 9: ...to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof capable of...

Page 10: ...outlet sizes NOTE The table below is based on copper tube Plastic pipes may be of different bore and resistance Sizes and maximum lengths of plastic should be calculated using data prepared for the ty...

Page 11: ...ry Circulation Connection To hot outlets Primary flow Primary return T P relief valve Balanced cold water connection if required Cold water combination valve Mains water supply Isolating valve not sup...

Page 12: ...raw off points Discharge pipework from valve outlets to tundish Connection to the primary circuit All connections are 22mm compression However 3 4 BSP parallel threaded fittings can be fitted to the p...

Page 13: ...8 9 10 1 2 3 4 5 6 7 8 9 10 Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW supplied Junction box 3 2 3...

Page 14: ...n the lever to the AUTOMATIC position Switch on the boiler ensure the programmer is set to Domestic Hot Water and allow the cylinder to heat up to a normal working temperature 60o C recommended If nec...

Page 15: ...f necessary the temperature can be adjusted by inserting a flat bladed screwdriver in the adjustment knob on front of the immersion heater thermostat and rotating The adjustment represents a temperatu...

Page 16: ...es with the 2 port motorised zone valve supplied to interrupt the flow of primary water around the heat exchanger coil when the control temperature has been reached The controls are located within the...

Page 17: ...3 Check and refit as required Water from hot taps is cold 1 Back up immersion heater not switched on 1 Check and switch on 2 Back up immersion heater thermal cut out has tripped 2 Check Reset by pushi...

Page 18: ...dish not shown 95 605 838 6 Cold water combination valve complete 70 365 20 7 Nut olive pack 4 of each 95 607 838 8 Terminal cover 95 614 305 9 Blanking plate assembly 95 605 881 10 Direct combined th...

Page 19: ...off your waste equipment for recycling please contact your local city office your household waste disposal service or the company where this product was purchased Insulation is by means of an approved...

Page 20: ...set temperature C I min Yes Type of control system if applicable Y Plan S Plan Other Is the cylinder solar or other renewable compatible Yes No What is the hot water temperature at the nearest outlet...

Page 21: ...Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date E...

Page 22: ...22 Notes...

Page 23: ...23 Notes...

Page 24: ...d that It has been correctly installed as per the instructions contained in the instruction manual and all relevant Codes of Practice and Regulations in force at the time of installation The Benchmark...

Reviews: