INSTALLATION INSTRUCTIONS
DL-FLEX2-NPX-TW
Instruction sheet subject to
change without prior notice
4/8/2022
Page 2 of 6
INSTALLATION
1. Configure design and layout of the system before attempting to install this product. Do not exceed the maximum
operating temperature of 122 degrees Fahrenheit. For dry or damp location use only.
Product
Max Run Length
DL-FLEX2-NPX-TW
16’
Note –
For dimming applications refer to the spec sheet and the wiring diagrams below.
2.
Turn off electricity
Before beginning installation, switch circuit breaker off or remove fuse.
3.
Determine location to install components
Refer to
WIRING DIAGRAMS
4.
Prepare LED flexible tape for installation
Cut the LED strip to desired lengths as required for your application. Only cut the LED strips along the designated
cut line as shown. Cutting anywhere else will damage the LED light strip.
5.
Optional – Assemble Crystal Connectors
See
CRYSTAL CONNECTOR INSTRUCTIONS
on page 6 and 7.
6.
Mount the LED Flexible tape
Clean the mounting surface. Remove backing on the flexible tape to expose adhesive (ensure ambient temperature
is minimum 50
°
F for proper adhesion). Carefully press the flexible tape to the mounting surface. Avoid pressing on
the yellow phosphor or any electrical component, avoid using excessive force and avoid pinching. When bending
tighter than a 1” radius, do so only at the cut mark.