
Section 4: Operation
5376000278
4-9
INSTALLING THE TIE-DOWN STRAPS
1. With the vehicle lifted just barely
o
ff
the ground, attach the strap
to the L-Arm. Be sure the hook
on the ratchet is securely seated
in the L-Arm.
2. Set the ratchet spool in “free
spool” position and pull the
webbed strap out and form a
loop which will wrap around the
tire. Be sure the loop is over a
minimum of 1/3 of the tire.
3. Take up the slack in the strap by
ratcheting the take-up spool arm.
Continue until the tires show
some compression. Repeat for
other side.
4. Raise the wheel grid to the
towing position.
Never tow a vehicle without
tire tie-down straps and
safety chains installed.
Re-tighten the ratchet
periodically as the tire settles
in grid from
towing.
Summary of Contents for MPL-60
Page 3: ...Revision Log 5376000278 a REVISION LOG November 13 2023 A Original Issue of Manual...
Page 8: ...Read This First f 5376000278 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 22: ...Section 1 General Safety Practices 1 12 5376000278 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 38: ...Section 3 Controls Indicators 3 8 5376000278 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 93: ...Inspection Maintenance and Repair Log Serial Number Date Comments...
Page 94: ...Inspection Maintenance and Repair Log Date Comments...
Page 96: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 97: ......