background image

 

Digital II_V_PB.en 

Side 7 of 9 

Issue May 2016 

 

 

 

Side 7 – Operating Instructions DIGITAL II and V 

 

By  setting  the  charge,  the  metal  weight  is  determined.  For  the  Rhodiumbath  a  setting  of  10  Amin 
would be mathematically a deposition of 60 mg (10 Amin x 6 mg / Amin = 60 mg). Please note, these 
are purely theoretical values, which may differ from the actual values.

 

 

Functions 

 

15 programs can be saved 

 

Display in 4 different languages (GER, ENG, SP, and F) is possible. For the choice of language press 
„OK“ button for 3 sec 

 

For the standby mode press button “start” for 3 sec 

 

The programs are flexible installable 

 
15 programs can be used 

EF  Degreasing 

Au

  Gold 

Ag

  Silver 

Rh

  Rhodium 

Ru

  Ruthenium 

Pd

  Palladium 

Pt

  Platinum 

Ni

  Nickel 

Cu

  Copper 

 

The programs from 1 to 6 are unnamed. For each tank up to 3 programs can be installed. 
 

Approach to programming 

1.

 

Turn on main switch 

2.

 

Press button „progr“ 

3.

 

Select with the rotary switch the desired program 

4.

 

Confirm with “ok” button 

5.

 

Now enter the working parameters. Press the respective button (time, voltage, etc. see below) 
and select the value using the rotary switch. The entries in each case confirm with

 "ok":

 

„Temp“ 

Temperature (if the bath must be heated) 

„Volt“  

 Voltage 

„Time“   

Choose between minute and second (or choose charge see above) 

 
If no time is entered permanent mode is chosen automatically. 

6.

 

When all values are entered, press button „progr" for 3 seconds to save the settings. The display 
shows the previously entered values 

7.

 

Press button „save“ 

8.

 

Confirm with „OK“ and return to the actual values 

9.

 

Start the process with  „start“ 

 
 
 

Summary of Contents for 9904.0000

Page 1: ...ons Small Size Electroplating Unit DIGITAL II and Digital V Jentner Plating Technology GmbH Johann Staib Strasse 2 75179 Pforzheim Germany Tel 07231 418 094 0 FAX 07231 418 094 77 info jentner de www...

Page 2: ...tanks PP 3 working and 3 rinsing tanks Dimension 150 x 100 x 150 mm Volume 1 5 litre 1 safety protection cable 1 thermo couple with titanium holder The Digital V includes 8 tanks PP 4 working and 4 r...

Page 3: ...olt setting voltage Button Charge setting Amin charge Button Time setting of exposure time Button Basin selection of the working tank Button OK save of the set values Button Prog selection of the work...

Page 4: ...tion for a good conductive contact The required anode material for example stainless steel MOX fine silver platinized titanium depends on each plating bath Please note the information in the data shee...

Page 5: ...de fuse holder Only micro fuse 4 A slow blow 115 250 V 5 20 mm must be used Attention Make sure there is good ventilation in the work area Rinse water and used chemicals must be disposed of properly P...

Page 6: ...t Temp Temperature measurement C T1 Temperature 1 T2 Temperature 2 U Voltage measurement Volt I Amperage measurement amp Ti Time Prog Program Charge Deposition measurement Amin example see below Examp...

Page 7: ...Pd Palladium Pt Platinum Ni Nickel Cu Copper The programs from 1 to 6 are unnamed For each tank up to 3 programs can be installed Approach to programming 1 Turn on main switch 2 Press button progr 3 S...

Page 8: ...gram the control is done for this process Do as following 1 Press button basin 3 seconds 2 Enter the desired value and basin 3 Press save 4 Leave with OK 5 Press button progr and choose the desired on...

Page 9: ...II_V_PB en Side 9 of 9 Issue May 2016 Side 9 Operating Instructions DIGITAL II and V Symbols of the display Amin Total charge exceeded Total charge all right Heater on Motion on Unit on Permanent ope...

Reviews: