background image

 

Digital II_V_PB.en 

Side 6 of 9 

Issue May 2016 

 

 

 

Side 6 – Operating Instructions DIGITAL II and V 

 

 
Programming of the DIGITAL II and Digital V 

 
Display 

 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
Light blue 

Visual display temperature, voltage and amp 

 

Dark blue 

Display of the Set Point values 

Green   

Display of the actual values 

Red 

 

Key designation oft the process parameters

 

 

 

 

Definitions 

Volt 

 

Voltage / measurement Volt 

Temp   

Temperature / measurement °C 

T1 

 

Temperature 1 

T2 

 

Temperature 2 

 

Voltage / measurement Volt 

 

Amperage /measurement amp 

Ti 

 

Time 

Prog 

 

Program 

Charge   

Deposition / measurement Amin (example see below) 

 

Example Charge Rhodiumbath 

Each plating bath uses a theoretical deposition value, eg Rhodium approximately 6 mg / Amin (value 
see  product  description). You  can  now  choose  whether  a  deposition time  should  be  selected,  or a 
charge is determined.

 

 
 

T1 

 

T2 

 

 

 

NOM. VALUES 
 
Temp. 1 
 
Temp. 2 
 
Vol 

 
 
40°C 
 
10°C 
 
6,0 V 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T1 

23°C 

 

0,0 A 

 

 

 

 

time 

00:45 

 

T2 

0°C 

 

6,0 V 

 

 

 

 

0,00 

Amin 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

Temp 

Volt 

Charge 

Timer 

Basin 

 
 

 

   

 

 
 
 

Summary of Contents for 9904.0000

Page 1: ...ons Small Size Electroplating Unit DIGITAL II and Digital V Jentner Plating Technology GmbH Johann Staib Strasse 2 75179 Pforzheim Germany Tel 07231 418 094 0 FAX 07231 418 094 77 info jentner de www...

Page 2: ...tanks PP 3 working and 3 rinsing tanks Dimension 150 x 100 x 150 mm Volume 1 5 litre 1 safety protection cable 1 thermo couple with titanium holder The Digital V includes 8 tanks PP 4 working and 4 r...

Page 3: ...olt setting voltage Button Charge setting Amin charge Button Time setting of exposure time Button Basin selection of the working tank Button OK save of the set values Button Prog selection of the work...

Page 4: ...tion for a good conductive contact The required anode material for example stainless steel MOX fine silver platinized titanium depends on each plating bath Please note the information in the data shee...

Page 5: ...de fuse holder Only micro fuse 4 A slow blow 115 250 V 5 20 mm must be used Attention Make sure there is good ventilation in the work area Rinse water and used chemicals must be disposed of properly P...

Page 6: ...t Temp Temperature measurement C T1 Temperature 1 T2 Temperature 2 U Voltage measurement Volt I Amperage measurement amp Ti Time Prog Program Charge Deposition measurement Amin example see below Examp...

Page 7: ...Pd Palladium Pt Platinum Ni Nickel Cu Copper The programs from 1 to 6 are unnamed For each tank up to 3 programs can be installed Approach to programming 1 Turn on main switch 2 Press button progr 3 S...

Page 8: ...gram the control is done for this process Do as following 1 Press button basin 3 seconds 2 Enter the desired value and basin 3 Press save 4 Leave with OK 5 Press button progr and choose the desired on...

Page 9: ...II_V_PB en Side 9 of 9 Issue May 2016 Side 9 Operating Instructions DIGITAL II and V Symbols of the display Amin Total charge exceeded Total charge all right Heater on Motion on Unit on Permanent ope...

Reviews: