I N T R O D U C T I O N
S I T E P R E P
5 . P R E - I N S TA L L AT I O N C H E C K
Verify customer’s selected door style.
Remove all installation materials from
the deli drawer.
Mark selected door style on templates and
door depth gauges with a permanent marker.
Verify that the diagonal measurements
of opening match.
Check design considerations document to
verify panel and toe-kick dimensions, as well
as gaps and overlays.
Check for correct join kits based on
configuration, left/right side, hinge/non-hinge
and installation order.
This helpful key tells you where you’ll be performing the steps in the following sections.
Note that columns are installed and numbered from left to right.
I N S T R U C T I O N K E Y
1
2
3
Perform the step on
every column you
are installing.
1
2
3
Perform the step
on the column
highlighted in blue.
1
2
3
Perform the step on
the furniture.
1
2
3
Perform the step
on a part that is not
attached to a column,
such as a door panel
or toe-kick.
Summary of Contents for ALOVE30RRC
Page 25: ...25 1 C O L U M N S ...
Page 32: ...32 2 J O I N K I T ...
Page 37: ...37 3 P O S I T I O N I N G B R A C K E T ...
Page 40: ...40 4 b D s S B R A C K E T I N S T A L L A T I O N ...
Page 48: ...48 4 15 COMPLETE 4 2 4 11 1 2 3 BADASS BRACKET INSTALLATION 4 ...
Page 49: ...49 5 F U R N I T U R E ...
Page 55: ...55 6 f I R S C O L U M N I N S T A L L A T I O N ...
Page 64: ...64 6 15 READJUST COLUMN SO THAT ALL DEPTHS MATCH 1 2 3 FIRST COLUMN INSTALLATION 6 ...
Page 65: ...65 7 o N D C O L U M N I N S T A L L A T I O N ...
Page 73: ...73 8 t H I R D C O L U M N I N S T A L L A T I O N ...
Page 81: ...81 9 p R E C O L U M N S F O R U S E ...
Page 85: ...85 9 7 EACH COLUMN TURN POWER ON 1 2 3 9 PREPARE COLUMNS FOR USE ...
Page 87: ...87 10 t o e I c k C U S T O M W O O D P R E P A R A T I O N ...
Page 90: ...90 11 t o e I c k S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 92: ...92 11 3 AT TACH BLUE TOE KICK AND COLUMN WIRES 1 2 3 TOE KICK STAINLESS STEEL PREPARATION 11 ...
Page 93: ...93 12 t o e I c k A L I G N A N D I N S T A L L ...
Page 98: ...98 13 A L C U S T O M W O O D P R E P A R A T I O N ...
Page 103: ...103 14 A L S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 106: ...106 15 A L H A N G A N D A L I G N ...
Page 112: ...112 15 11 EACH COLUMN REINSTALL BRACKET TRIMS 1 2 3 PANEL HANG AND ALIGN 15 ...
Page 113: ...113 16 c p l t I N S T A L L A T I O N ...
Page 140: ...140 1 Pr Eparati o n D E S A P P A R E I L S ...
Page 147: ...147 2 PR E PA R AT I O N D E L A T R O U S S E D E J O I N T ...
Page 152: ...152 3 PR E PA R AT I O N D E L A B R I D E D E P O S I T I O N N E M E N T ...
Page 155: ...155 4 I N S T A L L A T I O N D E L A B R I D E B A D A S S ...
Page 163: ...163 4 15 EFFECTUER LES ÉTAPES 4 2 À 4 11 1 2 3 4 INSTALLATION DE LA BRIDE BADASS ...
Page 164: ...164 5 PR E PA R AT I O N D U M E U B L E ...
Page 170: ...170 6 I N S T A L L A T I O N D U P R E M I E R A P P A R E I L ...
Page 180: ...180 7 I N S T A L L A T I O N D U D E U X I E M E A P P A R E I L ...
Page 188: ...188 8 I N S T A L L A T I O N D U T R O I S I E M E A P P A R E I L ...
Page 196: ...196 9 PR E PA R AT I O N D E L A P P A R E I L P O U R S O N U T I L I S A T I O N ...
Page 202: ...202 1 0 P R É P A R A T I O N D E L A P L I N T H E E N B O I S P E R S O N N A L I S É E ...
Page 205: ...205 1 1 P R É P A R A T I O N D E L A P L I N T H E E N A C I E R I N O X Y D A B L E ...
Page 208: ...208 1 2 A L I G N E M E N T E T I N S T A L L A T I O N D E L A P L I N T H E ...
Page 213: ...213 1 3 P R É P A R A T I O N D U P A N N E A U D E B O I S P E R S O N N A L I S É ...
Page 218: ...218 1 4 P R É P A R A T I O N D U P A N N E A U E N A C I E R I N O X Y D A B L E ...
Page 221: ...221 15 S U S P E N S I O N E T A L I G N E M E N T D U P A N N E A U ...
Page 228: ...1 6 T E R M I N E R L I N S T A L L A T I O N 228 ...
Page 232: ...232 N O T E S ...
Page 233: ...233 N O T E S ...
Page 234: ...234 N O T E S ...
Page 235: ...235 N O T E S ...