116
F I N A L C H E C K
All packaging removed from the residence
Columns plugged in, powered on and operating
at peak performance
Columns leveled
Panels aligned and rechecked after 20
minutes operation
Water supplies properly connected
with no leaks
Water filters installed (not applicable with
reverse osmosis system)
Water dispensers and/or ice makers working
Any problems with installation or parts reported
to JennAir Epicenter
OW N E R WA L KT H R O U G H
If the owner is present, provide them with the
User Guide. Guide the owner through:
Control panel functions
App and WiFi setup
Discarding first few batches of ice
Replacing the water filters
Registering their columns
How to contact JennAir Epicenter through
jennair.com or at 1-800-JENNAIR (536-6247)
COMPLETE
INSTALLATION
16
Summary of Contents for ALOVE30RRC
Page 25: ...25 1 C O L U M N S ...
Page 32: ...32 2 J O I N K I T ...
Page 37: ...37 3 P O S I T I O N I N G B R A C K E T ...
Page 40: ...40 4 b D s S B R A C K E T I N S T A L L A T I O N ...
Page 48: ...48 4 15 COMPLETE 4 2 4 11 1 2 3 BADASS BRACKET INSTALLATION 4 ...
Page 49: ...49 5 F U R N I T U R E ...
Page 55: ...55 6 f I R S C O L U M N I N S T A L L A T I O N ...
Page 64: ...64 6 15 READJUST COLUMN SO THAT ALL DEPTHS MATCH 1 2 3 FIRST COLUMN INSTALLATION 6 ...
Page 65: ...65 7 o N D C O L U M N I N S T A L L A T I O N ...
Page 73: ...73 8 t H I R D C O L U M N I N S T A L L A T I O N ...
Page 81: ...81 9 p R E C O L U M N S F O R U S E ...
Page 85: ...85 9 7 EACH COLUMN TURN POWER ON 1 2 3 9 PREPARE COLUMNS FOR USE ...
Page 87: ...87 10 t o e I c k C U S T O M W O O D P R E P A R A T I O N ...
Page 90: ...90 11 t o e I c k S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 92: ...92 11 3 AT TACH BLUE TOE KICK AND COLUMN WIRES 1 2 3 TOE KICK STAINLESS STEEL PREPARATION 11 ...
Page 93: ...93 12 t o e I c k A L I G N A N D I N S T A L L ...
Page 98: ...98 13 A L C U S T O M W O O D P R E P A R A T I O N ...
Page 103: ...103 14 A L S T A I N L E S S S T E E L P R E P A R A T I O N ...
Page 106: ...106 15 A L H A N G A N D A L I G N ...
Page 112: ...112 15 11 EACH COLUMN REINSTALL BRACKET TRIMS 1 2 3 PANEL HANG AND ALIGN 15 ...
Page 113: ...113 16 c p l t I N S T A L L A T I O N ...
Page 140: ...140 1 Pr Eparati o n D E S A P P A R E I L S ...
Page 147: ...147 2 PR E PA R AT I O N D E L A T R O U S S E D E J O I N T ...
Page 152: ...152 3 PR E PA R AT I O N D E L A B R I D E D E P O S I T I O N N E M E N T ...
Page 155: ...155 4 I N S T A L L A T I O N D E L A B R I D E B A D A S S ...
Page 163: ...163 4 15 EFFECTUER LES ÉTAPES 4 2 À 4 11 1 2 3 4 INSTALLATION DE LA BRIDE BADASS ...
Page 164: ...164 5 PR E PA R AT I O N D U M E U B L E ...
Page 170: ...170 6 I N S T A L L A T I O N D U P R E M I E R A P P A R E I L ...
Page 180: ...180 7 I N S T A L L A T I O N D U D E U X I E M E A P P A R E I L ...
Page 188: ...188 8 I N S T A L L A T I O N D U T R O I S I E M E A P P A R E I L ...
Page 196: ...196 9 PR E PA R AT I O N D E L A P P A R E I L P O U R S O N U T I L I S A T I O N ...
Page 202: ...202 1 0 P R É P A R A T I O N D E L A P L I N T H E E N B O I S P E R S O N N A L I S É E ...
Page 205: ...205 1 1 P R É P A R A T I O N D E L A P L I N T H E E N A C I E R I N O X Y D A B L E ...
Page 208: ...208 1 2 A L I G N E M E N T E T I N S T A L L A T I O N D E L A P L I N T H E ...
Page 213: ...213 1 3 P R É P A R A T I O N D U P A N N E A U D E B O I S P E R S O N N A L I S É ...
Page 218: ...218 1 4 P R É P A R A T I O N D U P A N N E A U E N A C I E R I N O X Y D A B L E ...
Page 221: ...221 15 S U S P E N S I O N E T A L I G N E M E N T D U P A N N E A U ...
Page 228: ...1 6 T E R M I N E R L I N S T A L L A T I O N 228 ...
Page 232: ...232 N O T E S ...
Page 233: ...233 N O T E S ...
Page 234: ...234 N O T E S ...
Page 235: ...235 N O T E S ...