Jenn-Air 36'' ISLAND-MOUNT CANOPY RANGE HOOD Installation Instructions And Use & Care Manual Download Page 7

7

12. Attach the upper horizontal support bracket with 4 - 5 x 

45 mm wood screws.

Install Range Hood

1. Position the 4 vertical supports (A) with the notches at the 

bottom and attach to the range hood using 16 - 4 x 8 mm 
screws. 

2. Attach the horizontal support (B) using 8 - 4 x 8 mm screws.

3. Attach a second set of vertical supports (A) and set the 

vertical height (B). See “Installation Clearances” in the 
“Location Requirements” section to help determine the 
desired dimension for vertical height “B.” 

4. Using 2 people, place the glass mantle onto the range hood.

5. Connect glass mantle to range hood with the 2 glass 

mounting brackets and 4 - 3.5 x 9.5 mm screws.

6. Attach the range hood assembly to the upper horizontal 

support attached to the ceiling using 16 - 4 x 8 mm screws 
and tighten.

Connect Vent System

1. Install vent system.

2. Push duct over the exhaust outlet. Seal all connections with 

vent clamps.

Non-Vented (recirculating) Installation

1. Attach the air deflector to the upper horizontal support using 

4 mounting screws.

2. Measure the length of 8" (20.3 cm) duct (not included) 

needed to connect the transition to the deflector.

NOTE: Vent should fit up inside the deflector 1" (2.5 cm) 
minimum.

3. Install vent between the transition and the deflector.

NOTE: To make vent installation easier, temporarily remove 
the deflector from the chimney support bracket and replace 
after vent section is in place.

4. Seal all connections with vent clamps.

A. Upper horizontal support

A. Vertical supports
B. Horizontal support

C. Notched end

A. Vertical suppoarts
B. Vertical height

A. Glass mantle

A

B

A

A

C

C

B

A

A

A

A. Glass mounting bracket
B. 3.5 x 9.5 mm screws

A. Mounting screws

A. Deflector
B. Mounting screws

A

A

B

A

B

A

Summary of Contents for 36'' ISLAND-MOUNT CANOPY RANGE HOOD

Page 1: ...6247 or visit our website at www jennair com In Canada call 1 800 807 6777 or visit our website at www jennair ca Instructionsd installationetGuided utilisationetd entretien Au Canada pour assistance...

Page 2: ...Installation des filtres 23 Achever l installation 23 UTILISATION DE LA HOTTE 23 Afficheur 23 clairage 24 Minuterie 24 Boutons de vitesse du ventilateur 24 ENTRETIEN DE LA HOTTE DE CUISINI RE 25 Nett...

Page 3: ...e American Society for Heating Refrigeration and Air Conditioning Engineers ASHRAE and the local code authorities When cutting or drilling into wall or ceiling do not damage electrical wiring and othe...

Page 4: ...ructure behind the plaster or drywall The support structure must be able to support 80 lbs 36 6 kg The range hood is factory set for venting through the roof or wall For non vented recirculating Insta...

Page 5: ...ide of the thermal break The break should be as close as possible to where the vent system enters the heated portion of the house Makeup Air Local building codes may require the use of makeup air syst...

Page 6: ...ge hood is installed Before making cutouts make sure there is proper clearance within the ceiling for exhaust vent Range hood is to be installed 24 61 0 cm min for electric cooking surfaces 27 68 6 cm...

Page 7: ...x 8 mm screws and tighten Connect Vent System 1 Install vent system 2 Push duct over the exhaust outlet Seal all connections with vent clamps Non Vented recirculating Installation 1 Attach the air de...

Page 8: ...er 10 Check all light bulbs are secure in their sockets 11 Reconnect power InstallDuctCovers 1 Attach the vertical duct cover supports using 4 4 x 8 mm screws 2 Slide upper duct covers into place unti...

Page 9: ...r saturation alarm press and hold the POWER INCREASE button for 5 seconds The Clean Grease Filter icon will no longer be displayed Charcoal Filter Saturation Alarm After 120 hours of fan function the...

Page 10: ...ng 5 seconds after selecting the desired time will start the timer countdown 3 The timer can be canceled at any time by pressing the Timer button again NOTE During the timer setup the Power Decrease a...

Page 11: ...he highest temperature setting To reactivate the filter the filter should be dried in an oven for 10 minutes with a maximum temperature of 210 F 100 C To Replace Charcoal Filters 1 Turn fan and lights...

Page 12: ...Power Board Electronic User Interface 1 2 3 4 5 1 2 3 4 5 6 W R GY BR Y BR Y G BR BR R R BK BR R BR Transformer PRI Y Y SEC Y Y Transformer I R P Y Y C E S M GY W R BK BU BU R W GY BK 1 Y G G Y BU W B...

Page 13: ...name address and daytime telephone number 2 Appliance model number and serial number 3 Name and address of your dealer or servicer 4 A clear description of the problem you are having 5 Proof of purcha...

Page 14: ...e service by an authorized Jenn Air servicer is not available 10 The removal and reinstallation of your major appliance if it is installed in an inaccessible location or is not installed in accordance...

Page 15: ...n cas de non respect des instructions Votre s curit et celle des autres est tr s importante Nous donnons de nombreux messages de s curit importants dans ce manuel et sur votre appareil m nager Assurez...

Page 16: ...que d incendie et vacuer ad quatement les gaz veiller acheminer l air aspir par un conduit jusqu l ext rieur ne pas d charger l air aspir dans un espace vide du b timent comme une cavit murale un plaf...

Page 17: ...i C est l installateur qu incombe la responsabilit de respecter les distances de s paration sp cifi es sur la plaque signal tique de l appareil La plaque signal tique de l appareil est situ e derri re...

Page 18: ...m pour des performances optimales Pour un fonctionnement efficace et silencieux Ne pas utiliser plus de trois coudes 90 Veiller ce qu il y ait une section droite de conduit d un minimum de 24 61 0 cm...

Page 19: ...de liaison la terre il est recommand qu un lectricien qualifi v rifie la qualit de la liaison la terre Pour obtenir un exemplaire de la norme des codes ci dessus contacter National Fire Protection As...

Page 20: ...QUE Les trous de montage devront tre perc s dans la structure de soutien du plafond Retirer le gabarit 8 Percer 4 avant trous de 4 8 mm pour le montage du support horizontal sup rieur 9 D terminer l e...

Page 21: ...ions Installation sans d charge l ext rieur recyclage 1 Fixer le d flecteur d air au support horizontal sup rieur l aide des 4 vis de montage 2 Mesurer la longueur de conduit d vacuation de 8 20 3 cm...

Page 22: ...de connexion 10 Inspecter chaque lampe v rifier que chaque lampe est bien ins r e dans sa douille 11 Reconnecter la source de courant lectrique Installationdescache conduits 1 Fixer les supports de ca...

Page 23: ...de commande Les commandes de la hotte sont situ es l avant de la hotte Afficheur Alarme de saturation du filtre graisse Apr s 30 heures de fonctionnement du ventilateur l affichage indique Clean Grea...

Page 24: ...ventilateur retourne au r glage qui avait t effectu avant que le niveau de chaleur excessif ne soit d tect clairage Fonctionnement de l clairage 1 Appuyer sur le bouton de symbole d clairage pour met...

Page 25: ...ns horaire pour le verrouiller en place Filtres charbon Installation sans d charge l ext rieur recyclage REMARQUE On doit remplacer le filtre charbon apr s environ 3 ans d utilisation Pour commander u...

Page 26: ...ilisateur lectronique 1 2 3 4 5 1 2 3 4 5 6 BL R GRIS MAR JA MAR JA VE MAR MAR R R N MAR R MAR Transformateur PRI JA JA SEC JA JA Transformateur I R P JA JA C E S M GRIS BL R N BU BU R BL GRIS N 1 VE...

Page 27: ...ez vous de conserver la preuve d achat pour v rifier les conditions de la garantie Si le marchand ou la compagnie de service ne peut pas r soudre votre probl me crivez Jenn Air Brand Home Appliances C...

Page 28: ...ou n est pas install conform ment aux instructions d installation fournies 11 Les gros appareils m nagers dont les num ros de s rie et de mod le originaux ont t enlev s modifi s ou qui ne peuvent pas...

Reviews: