4
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Tools needed
Parts supplied
Check that all parts are included.
■
LP/Natural Gas Conversion Kit (taped behind access panel)
■
4 or 5 - Burner caps (depending on model)
■
2 - Burner grates
■
2 or 3 - Oven racks (depending on model)
■
Blower motor
■
2 - vent clamps
■
Flexible vent
■
Flow tester card
■
Blower location template
■
4 - #8 x ¾" screws (for mounting blower motor bracket)
■
2 - #12 x 1
⁵⁄₈
" screws (for mounting anti-tip bracket)
■
Anti-tip bracket (taped to package containing literature in
oven cavity)
Anti-tip bracket must be securely mounted to the back wall or
floor. Thickness of flooring may require longer screws to
anchor bracket to subfloor. Longer screws are available from
your local hardware store.
Parts needed
■
One of the following Jenn-Air wall caps:
Jenn-Air
®
5" (12.7 cm) Round Surface Wall Cap Damper
Order Part Number A405
Jenn-Air
®
6" (15.2 cm) Round Surface Wall Cap Damper
Order Part Number A406
Jenn-Air
®
3¼" x 10" (8.3 x 25.4 cm) Surface Wall Cap Damper
Order Part Number A403
To order, see the “Assistance or Service” section of the Use
and Care Guide.
■
Metal ducting
■
Vent clamps
■
Concrete anchors (for concrete floor mounting)
Check local codes and consult gas supplier. Check existing gas
supply and electrical supply. See “Electrical Requirements” and
“Gas Supply Requirements” sections.
■
Tape measure
■
Phillips screwdriver
■
Flat-blade screwdriver
■
¹⁄₈
" flat-blade screwdriver
■
Saber or keyhole saw
■
Level
■
Drill
■
Wrench or pliers
■
Pipe wrench
■
⁵⁄₁₆
" nut driver
■
¼" nut driver
■
¹⁵⁄₁₆
" combination wrench
■
¹⁄₈
" (3.2 mm) drill bit (for
wood floors)
■
Marker or pencil
■
Pipe-joint compound
resistant to LP gas
■
³⁄₁₆
" (4.8 mm) carbide-tipped
masonry drill bit (for
concrete/ceramic floors)
■
Noncorrosive leak-detection
solution
For LP/Natural Gas
Conversions
■
½" combination wrench
■
¼" (6 mm) nut driver
■
⁹⁄₃₂
" (7 mm) nut driver
■
Masking tape
Summary of Contents for 30"GAS DOWNDRAFT SLIDE-IN
Page 31: ...31 Notes ...
Page 63: ...63 Notes ...