8
2.3 Optional parts
1. Jacking beam light
2. Mobile Kit (OPTIONAL)
3. Installation instructions
3.1 Preparations before installation
3.1.1 Tools and equipments needed
Appropriate lifting equipment
Anti-abrasion hydraulic oil.
Rotary Hammer Drill with 3/4’’ drill bit.
Chalk and tape measure, magnetic plump, 8 meters ø15 level pipe.
Sockets and open wrenches, a set of inside hex wrenches, cross and straight screwdrivers.
Hammer, 4pounds,
sharp nose pliers,
ø17 and ø19 and ø22 socket spanners.
3.1.2 List for parts checking ---Annex 1
(
Packing list
)
Unfold the package and check if any parts missed as per Annex 1. Do not hesitate to contact us in case any parts missed, but if
you do not contact us and insist installing upon the lack of some parts, Jema Autolifte A/S as well as our dealers will not bear any
responsibility for this and will charge for any parts subsequently demanded by the buyer.
3.1.3 Ground conditions
The lift should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less than
5mm and minimum thickness of 200mm. In addition, newly built concrete ground must undergo more than 28days
’ cure and
reinforcement.