![Jegs 86012 User Manual Download Page 17](http://html.mh-extra.com/html/jegs/86012/86012_user-manual_641733017.webp)
Never connect generators that are
different models.
• Only connect to another 86002 Generator.
• Only use a JEGS approved parallel operation
cable kit to connect generators.
• Never exceed maximum power , this setup may
be used for no more than 30 minutes.
• The parallel cable must be removed if operating
only one generator.
• Never disconnect or remove the parallel operation
cable while the generator is still running.
Operation Cont.
Don’t Overload the Generator
Make sure that your generator can supply enough
rated watts and surge watts for all electrical loads
connected to the generator. Surge watts refer to the
power a generator must supply to start an electrical
device. This power surge for starting a device usually
lasts between 2-3 seconds but this additional output
must be considered when selecting the electrical
devices you plan to attach to the generator.
Operating voltage and frequency requirement of all
electrical equipment should be verified prior to plug-
ging them into this generator. Damage may result if
the equipment is not designed to operate within a
+/- 10% voltage variation, and +/- 3 Hz frequency
deviation from the generator name plate ratings.
Never exceed generator’s wattage/
amperage capacity. This could damage
the generator and connected electrical devices.
• Verify the operating voltage and frequency
requirements of all electrical devices prior to
plugging in to the generator.
16