- 34 -
5.4.2 Bilge pumps and drainage
General points
- The inner moulding of the hull has channelling: the drainage channels. The drainage
channels allow the water to drain down to the lowest point in the boat, where it can be
discharged.. So it is important to allow the water to flow freely down to this lowest point of the
boat, which includes.
- Regularly cleaning the lowest point of the boat and the drainage channels.
Diagram of the layout - Bilge pumps
Reference
Designation
Rate
1
Manual bilge pump
32p/minute
(*)
2
Manual bilge pump lever
3 & 3’
Electric bilge pump
108p/minute
4
Electric bilge pump switch
(*) 45 strokes/minute
If 70 stroke/minute: rate 35p/minute
Summary of Contents for VELASCO 43 F
Page 1: ...VELASCO 43 F OWNER S MANUAL C ROISIERE 164060 Index A ...
Page 2: ......
Page 10: ......
Page 16: ......
Page 46: ......
Page 60: ... 60 7 2 7 Layout of the deck wiring looms DC circuit B4 B5 B10 B11 B9 ...
Page 64: ... 64 Location Technical room 120A Electric windlass 120A Gangway 120A tenderlift ...
Page 78: ... 78 Dismantling the touch screen The touch screen is clipped to an aluminium support ...