135/142
LAUNCHING RECOMMENDATIONS
A lot of skill and care is required to commission your JEANNEAU boat. The proper working of
all your boat's equipment is the result of the quality of the commissioning operations.
The initial launching and the first tests of the different equipments shall be carried out by your
JEANNEAU dealer or agent so you can expect to enjoy the warranty in case of some
equipment failure.
If later you have to launch your boat yourself, you should take the following precautions:
BEFORE LAUNCHING
- If your boat is to be fitted with sounder and speedometer, allow for the relevant fittings
and their installation.
- Check the water intake strain box for cleanliness.
- Check the engine and reduction gear oil levels (refer to engine manual).
- Turn off the engine cooling water drain valves.
- All the optional accessories shall be sealed with paste.
- Retract the speedometer into its housing (it may be damaged by the handling belts).
- For the on-line engines, check the anode at the end of the shaft is in place. Check the
nut tightening (the lock washer shall be turned over onto the nut). The anode shall not
be painted.
- Turn off all the water inlet and drain valves (sink, washbasin, heads, engine).
12
LAUNCHING
Summary of Contents for SUN ODYSSEY 45DS
Page 1: ...SUN ODYSSEY 45DS OWNER S MANUAL C ROISIERE 134913 Index H...
Page 2: ......
Page 4: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 18: ......
Page 24: ...20 142...
Page 32: ...28 142 13 19 17 18 12 11 15 14 16...
Page 35: ...31 142 HULL MAINTENANCE OF THE HULL LIFTING 3...
Page 38: ......
Page 49: ...45 142 STEERING SYSTEM STEERING GEAR 5...
Page 52: ......
Page 53: ...49 142 RIGGING AND SAILS STANDING RIGGING RUNNING RIGGING WINCHES SETTING THE SAILS SAILS 6...
Page 66: ......
Page 67: ...63 142 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 7...
Page 74: ...70 142...
Page 76: ......
Page 79: ...75 142 WATER SYSTEM DISTRIBUTION 8 WATER AND SEWAGE WATER...
Page 82: ...78 142 A DETAIL A B DETAIL B C DETAIL C 4 5 6 7 1 2 3 4 7 8 9 2 1 6 3 4 5 10 5...
Page 86: ......
Page 91: ...87 142 GAS GAS SYSTEM 9...
Page 107: ...103 142 ENGINE GENERAL INFORMATION ENGINE FITTING MAINTENANCE 360 DOCKING VERSION 11...
Page 108: ...104 142 ENGINE FITTING...
Page 109: ...105 142 DIAGRAM LOCATION 11 ENGINE...
Page 112: ......
Page 136: ...132 142 10 Layout diagram...
Page 137: ...133 142 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 12...
Page 138: ...134 142 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm...
Page 141: ...137 142 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 13...
Page 144: ......
Page 146: ......