- 146 -
16.4 LAUNCH/LIFT OUT
A lot of skill and care is required to commission your boat. The proper working of all your boat's
equipment is the result of the quality of the commissioning operations. This is why the initial
launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see the chapter on Electricity).
- Check the propeller (see the chapter on Steering).
- Prepare enough fenders and lines.
- Check the engine's sea water intake valve and the fuel feed valve (see the chapter on
motorisation).
16.5 STEPPING/UNSTEPPING THE MAST
The stepping /unstepping operations require the skills of a professional rigger: please consult
your dealer.
Do not remain onboard or beneath the boat during the handling operations.
- When placing the slings make sure that the positioning marks are still visible.
- Submerge the sling fully under the engine mounting.
Summary of Contents for SUN FAST 3600
Page 1: ...SUN FAST 3600 OWNER S MANUAL C ROISIERE 979012 Index A...
Page 2: ......
Page 6: ......
Page 10: ......
Page 16: ......
Page 20: ......
Page 22: ......
Page 24: ...24...
Page 25: ...25 5 32 33 34 35 38 39 40 RIGGING AND SAILS...
Page 26: ...26 1 2 3 4 5 5 5 6 6 7 7 14 8 8 14...
Page 27: ...27 5 19 19 20 22 22 21 17 18 15 16 14 14 30 31 31 12 12 RIGGING AND SAILS...
Page 37: ...37 Mast foot 5 57mm Reference Jeanneau 156313 Harken H3214 Quantity 8 RIGGING AND SAILS...
Page 44: ...44 V2 D3 7 mm diameter 4 630mm 9 396mm D2 5 mm diameter 4 786mm...
Page 45: ...45 5 2 2 Mast Profile 122 x 195mm Weight 4 9 Assembly Mast foot 5 RIGGING AND SAILS...
Page 46: ...46 Pulley support strap Adjustable boom car...
Page 48: ...48 Mounting of spreaders Mounting of spreader ends Discontinuous rigging...
Page 49: ...49 Mounting of spreader ends Continuous rigging 5 RIGGING AND SAILS...
Page 58: ...58 DETAILS OF DECK PLAN Cockpit Roof Mainsail winch Genoa winch Step...
Page 86: ...86 8 2 6 Electrical panel Location Saloon...
Page 90: ...90 8 3 2 Layout diagram AC electrical system Layout diagram Load 0 1 2 B07 3...
Page 92: ......
Page 96: ...96 Layout of components Gas cylinder locker Closed Open Gas supply valve Cooker...
Page 98: ......
Page 100: ......
Page 104: ...104 Water tank Capacity 100 litre...
Page 105: ...105 11 4 FRESH WATER DISTRIBUTION SYSTEM 11 4 3 6 2 7 9 WATER SYSTEMS...
Page 106: ...106 M M 1 1 3 10 1 5 10 2 4 6 7 8 9...
Page 126: ...126 01 02 3 3 4 4 5 6 8 8 9 9 10 13 14 15 16 18 19 17 20 20 15 11...
Page 136: ......
Page 142: ......
Page 148: ...148 16 7 TRANSPORT PACKING PLAN Measurements are expressed in millimetres 5...
Page 150: ......