
- 91 -
992092
Index B
12.3 BERTHING, ANCHORING, TOWING
12.3.1 Anchor points
Responsibility
It is the responsibility of the owner/user of the boat to ensure that the berthing lines, towing
cables, chains and mooring lines and the anchors are adequate for the intended use of the
boat, i.e. that the lines or chains do not exceed 80 % of the breaking strength of the
corresponding anchor point.
If non-metal anchor points are installed on the boat, their limited lifespan must be taken into
account. They must be replaced as soon as they show signs of deterioration, visible surface
cracks or permanent deformation.
MOORING LINES / MOORING / TOWING
Reference
(Diagram on next page)
A&B
Anchor Point Breaking Strength
19,8 kN
Mooring Line/Chain Breaking
Strength
15,9 kN
12
D
E
C
K
F
IT
T
IN
G
S
Summary of Contents for CAP CAMARAT 7.5 CC serie 2
Page 1: ...992092 Index B CAP CAMARAT 7 5 CC OWNER S MANUAL ...
Page 2: ......
Page 6: ......
Page 10: ......
Page 12: ......
Page 16: ......
Page 20: ......
Page 24: ......
Page 34: ......
Page 46: ... 46 992092 Index B 7 2 4 1 DC electrical schematic diagram 12 V ...
Page 56: ... 56 992092 Index B Water tank Location Cockpit locker Capacity 80 litre WATER filler ...
Page 68: ......
Page 90: ... 90 992092 Index B 12 2 2 Rod holder 12 2 3 Seat cockpit 12 2 4 Pilot seat ...
Page 96: ......
Page 100: ......
Page 108: ......
Page 112: ... 112 992092 Index B ...