
- 29 -
992092
Index B
5.4.2 Drainage system
General points
- The inner moulding of the hull has channelling: the drainage channels. The drainage
channels allow the water to drain down to the lowest point in the boat, where it can be
discharged. So it is important to allow the water to flow freely down to this lowest point of the
boat, which includes.
- Regularly cleaning the lowest point of the boat and the drainage channels.
Diagram of the layout - Bilge pumps
Reference
Designation
Rate
1
Manual bilge pump
32p/minute
(*)
2
Manual bilge pump lever
3 & 3’
Electric bilge pump
30p/minute
4
Switch - Forward electrical bilge pump
4’
Switch - Aft electric bilge pump
(*) 45 strokes/minute
If 70 stroke/minute: rate 35p/minute
5
S
A
F
E
T
Y
Summary of Contents for CAP CAMARAT 7.5 CC serie 2
Page 1: ...992092 Index B CAP CAMARAT 7 5 CC OWNER S MANUAL ...
Page 2: ......
Page 6: ......
Page 10: ......
Page 12: ......
Page 16: ......
Page 20: ......
Page 24: ......
Page 34: ......
Page 46: ... 46 992092 Index B 7 2 4 1 DC electrical schematic diagram 12 V ...
Page 56: ... 56 992092 Index B Water tank Location Cockpit locker Capacity 80 litre WATER filler ...
Page 68: ......
Page 90: ... 90 992092 Index B 12 2 2 Rod holder 12 2 3 Seat cockpit 12 2 4 Pilot seat ...
Page 96: ......
Page 100: ......
Page 108: ......
Page 112: ... 112 992092 Index B ...