7.

The JHBEX is basically maintenance-free. 
Is is recommended to replace the JHBEX after 5 years 
of operation in order to guarantee the function in the long 
term. 
The following must be checked as part of the regular 
checks: 

Visual check for damage to the cable gland and 

JHBEX or  connection cable. 
If damage is visible, the JHBEX must be replaced. 
To do this, proceed as described under 
dis assembly. 
 
Visual inspection for corrosion 

- slight discoloration from yellow into ochre is no 
cause for concern. 
- The JHBEX

must be replaced if corrosion is visible 

on the JHBEX 
Visual inspection for dust deposits 

- during cleaning the zone release must be ensured. 
- wait for the cool down of the surface of JHBEX. 
- remove dust with a cloth moistened with tap water 

 

Check tightening torque of cable gland. 

- while tightening the cable gland a zone release 
must be ensured 
- tighten the union nut of the cable gland. Recom-
mended tightening torque 20 Nm 
Visual check of fixing screws if they have loosened: 

- during the retightening of the screws the zone  
release must be ensured 
- wait for cool down 
- tighten the screws 
Recommended tightening torque max. 2.4 Nm 

Wartung 

7.

Der JHBEX ist grundsätzlich wartungsfrei. 
Es wird empfohlen den JHBEX nach 5 Jahren Betriebs-
dauer zu tauschen, um dauerhaft die Funktion zu ge-
währleisten. 
Im Rahmen der regelmäßigen Kontrollen ist folgendes 
zu überprüfen: 

Visuelle Kontrolle auf Beschädigungen von 

Kabelverschraubung, JHBEX und Anschlusskabel. 
Sollten Beschädigungen sichtbar sein, ist der 
JHBEX zu tauschen. 
Dazu ist wie unter Demontage beschrieben 
vorzugehen. 
Visuelle Kontrolle auf Korrosion 

- Eine leichte Verfärbung von Gelb ins Ocker ist 
kein Grund zur Besorgnis. 
- Der JHBEX ist zu tauschen, wenn Korrosion am 
JHBEX

erkennbar ist. 

Visuelle Kontrolle auf Staubablagerungen 

- während der Reinigung ist Zonenfreigabe sicher-
zustellen. 
- Abkühlen der Oberfläche des JHBEX abwarten. 
- Staub mit einem mit Wasser befeuchtetenTuch  
entfernen. 
Kontrolle Anzugsmoment Kabelverschraubung 

- während des Nachziehens des Kabelverschrau-
bers ist die Zonenfreigabe sicherzustellen 
- Nachziehen der Überwurfmutter der Kabelver-
schraubung, empfohlenes Anziehmoment 20 Nm 
Kontrolle der Fixierschrauben, falls locker: 

- während des Nachziehens der Schrauben ist die 
Zonen freigabe sicherzustellen 
- Abkühlen abwarten 
- Schrauben nachziehen 
Empfohlenes Anzugsmoment max. 2,4 Nm

Summary of Contents for JHBEX

Page 1: ...JES 360 JES 360H Date Stand 03 21 OPERATING MANUAL BEDIENUNGS ANLEITUNG OPERATING MANUAL BEDIENUNGS ANLEITUNG JHBEX Date Stand 04 22 Heizblock für Ex Zonen Heating Block for Ex zones ...

Page 2: ...rface 7 2 3 1 JHBEX with round contact surface 7 2 3 2 JHBEX with flat contact surface 7 3 Technical data 8 4 X requirements Specific comment for use 8 5 Assembly 10 5 1 Mechanical assembly 10 5 2 Electrical connection 10 6 Start up 11 7 Maintenance 12 8 Dismantling 13 9 Fault diagnostic 13 10 Recycling Disposal 13 11 Dimensions 14 11 1 JHBEX with round heat transfer surface 14 11 2 JHBEX with fla...

Page 3: ...o hand over these operating manual as well as they are an essential part of the product Explanation of symbols 1 2 If a section of text is marked with one of the following warning symbols the danger described in the text must be avoided in order to prevent the possible consequen ces described there General safety information 1 3 The JHBEX is a device for usage in for use in potentially explosive a...

Page 4: ...htbeachtung kann zu Sach und oder Personenschäden führen Bei Nichtbeachtung der Sicherheitsvorrichtungen und der in dieser Betriebsanleitung aufgeführten Warn Hinweise übernimmt JCT keine Haftung Dies gilt sowohl bei der Installation beim Betrieb als auch bei Wartung Auch dann wenn in dieser Bedienungs und Wartungs anleitung nicht ausdrücklich darauf hingewiesen wird JCT haftet nicht für eigenmäch...

Page 5: ...0 ATEX E 029 X II 1 2D Ex tb Da IIIC T230 C Db Gb BVS 20 ATEX E 029 X Ex db Ga IIC 230 C T2 Gb IECEx BVS 20 0023X Ex tb Da IIIC T230 C Db IECEx BVS 20 0023X 2000 Zone 1 21 Zone 0 20 T3 T 200 C 60 C 150 C II 1 2G Ex db Ga IIC T3 Gb BVS 20 ATEX E 029 X II 1 2D Ex tb Da IIIC T200 C Db BVS 20 ATEX E 029 X Ex db Ga IIC T3 Gb IECEx BVS 20 0023X Ex tb Da IIIC T200 C Db IECEx BVS 20 0023X 1350 Zone 1 21 Z...

Page 6: ...zone 1 21 zone 2 22 2 zone 2 22 Montagefläche Mounting surface gebogen R round gerade F flat Befestigung Mounting ohne Montagelöcher 0 without mounting holes 2 Montagelöcher 2 2 mounting holes 4 Montagelöcher 4 4 mounting holes ANSI ISA SP76 standard 6 ANSI ISA SP76 standard Kabellänge Cable length 3 m L1 3 m 10 m L2 10 m 0 5 m L3 0 5 m 1 m L4 1 m Kabelverschraubung Cable gland nicht für Panzerroh...

Page 7: ...ng Wärmeableitung über Kabelverschraubung verboten Heat discipitation over cable clamp prohibited Anschluss für Erdung M5 Gewinde Grounding position M5 thread Wärmetransferfläche Muss vor Montage mit Wärmeleitpaste dünn bestrichen werden Heat transfer surface Must be coated thinly with heat conductive paste before mounting Anschluss für Untertemperaturkontakt M3 Gewinde max 7 tief Mounting positio...

Page 8: ...t werden wo die Wärmeabgabe des Heizblocks über Pmin liegt Der Nachweis dazu kann rechnerisch oder durch Messung erfolgen Bei Bedarf können JCT Techniker unterstützen Pmin Watt 0 25 Umgebungstemperatur C 101 Construction Mounting position coat the contact surface with heat transfer paste and apply it to the en tire surface Weight 0 4 kg Body material aluminium Housing color yellow Heating element ...

Page 9: ... block JHBEX 1352xxxxx There are no additional requirements for this heating block Wärmeableitung über Kabelverschraubung verboten JHBEX 2000xxxxx Der Heizblock darf nur auf eine thermische Last aufge schraubt betrieben werden Leistungsabgabe mindestens 35W Wärmeableitung über Kabelverschraubung verboten JHBEX 1350xxxxx Der Heizblock darf nur auf eine thermische Last aufge schraubt be trieben werd...

Page 10: ...box Tighten the union nut of the cable gland Recommended tightening torque 20 Nm Montage 5 Mechanische Montage 5 1 Nach dem Auspacken auf Transportschäden untersuchen Beschädigte Teile dürfen nicht verbaut werden Überprüfen ob der JHBEX den Anforderungen Ihrer Zoneneinteilung entspricht Während der Montage ist die Zonenfreigabe sicherzustellen Der JHBEX ist an der Auflagefläche mit Wärmeleit paste...

Page 11: ...annung übereinstimmen HINWEIS Die Farbe des JHBEX kann sich nach dem Auf heizen geringfügig verändern Das hat keinen Einfluss auf die Funktion WARNING Disconnect the power supply when working on the device Secure against being switched on again Check that no voltage is present Ground and short circuit Cover or isolate adjacent live parts CAUTION The device gets very hot during operation During any...

Page 12: ...red wait for cool down tighten the screws Recommended tightening torque max 2 4 Nm Wartung 7 Der JHBEX ist grundsätzlich wartungsfrei Es wird empfohlen den JHBEX nach 5 Jahren Betriebs dauer zu tauschen um dauerhaft die Funktion zu ge währleisten Im Rahmen der regelmäßigen Kontrollen ist folgendes zu überprüfen Visuelle Kontrolle auf Beschädigungen von Kabelverschraubung JHBEX und Anschlusskabel S...

Page 13: ...nik GmbH zu schicken Dazu ist das RMA Formular auf unserer Web site vollständig auszufüllen www jct at rma Andernfalls kann das Gerät zum Schutz der JCT Mitarbeiter nicht übernommen werden Fehlerdiagnose 9 Recycling Entsorgung 10 Entsprechend Richtlinie 2012 19 EU ist das Gerät am Ende seiner Lebensdauer einer geordnetenn Entsorgung zuzuführen Das Gerät enthält Bauteile die wiederverwertet werden ...

Page 14: ...Wärmetransferfläche 11 1 JHBEX mit flacher Wärmetransferfläche 11 2 BA_JHBEX_v1 21 14 15 Manual JHBEX JCT 108 L min 300 35 R 4 0 6 6 6 6 30 30 M3 m ax 7m m 7 O 3G 1mm Erdungsanschluss M5 max 3 5Nm 33 142 O 4 5 O 4 5 24 SW 108 142 29 50 min 300 L 35 2 4 S W Erdungsanschluss M5 max 3 5Nm 24 24 6 6 6 O 4 5 M 3 m a x 7 m m 7 O 3G 1mm O 4 5 ...

Page 15: ...ct at wp content uploads 2021 03 JHBEX_Dekra_BVS 20 ATEX E 029 X_EU Type Examination Certificate 1 pdf Beheizung in ZONE 1 und oder einwirkend auf ZONE 0 https jct at wp content uploads 2021 03 JHBEX_Dekra_BVS 20 ATEX E 034 X_EU Type Examination Certificate 1 pdf Beheizung in ZONE 2 https jct at wp content uploads 2021 03 JHBEX_IECEx_BVS_20 0023_000 pdf https jct at wp content uploads 2021 03 JHBE...

Reviews: