Operational Flowcharts
Section 7
© 2020, JAPAN CASH MACHINE CO., LTD.
2 1
Discharging Flowchart
Figure 15 depicts a typical RBA-40C Banknote Discharging flow process.
Figure 15
a) Discharging the Banknote
B) From “Validation” Flowchart (Figure 14)
C) To “Initialization and Banknote Acceptance” Flowchart
(Figure 13)
*1). When an abnormal signal is received, remove and reapply Power to the RBA-40C Unit after resolving the problem, or send
a RESET Command from the Host Machine.
B
C
b
c
d
YES
NO
a
e
b) Rotate the PB Unit
c) The PB Unit operates normal?
d) Stop operation (Abnormal Signal Output) (*1)
e) Send Denomination Signal
Figure 15
RBA-40C Discharging Flowchart
Summary of Contents for RBA-40C
Page 6: ...Issue 4119 IGE 01 00 2020 JAPAN CASH MACHINE CO LTD iv THIS PAGE INTENTIONALLY LEFT BLANK...
Page 8: ...Issue 4119 IGE 01 00 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 43: ...RBA 40C Banknote Acceptor Issue 4119 IGE 01 00 2020 JAPAN CASH MACHINE CO LTD...