© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 1 4
Section 4
UBA Pro RT/RQ™ Series Banknote Recycler
Disassembly/Reassembly
TR Worm Wheel (Twin) Removal
To remove the TR Worm Gear (Twin) out of the
RQ Frame Unit, proceed as follows:
1. Remove the two (2) Screws (Figure 4-65
a
1
&
a
2
)
to remove the Box Connect Module (Figure 4-65
b
).
2. Remove the eight (8) Screws (Figure 4-66
a
1
through
a
8
) to remove the Rear Motor Cover(Fig-
b
).
3. Remove the Wheel Assy. (Figure 4-67
a
).
4. Remove the two (2) Bearings (Figure 4-67
b
1
&
b
2
) from the TR Worm Wheel (Twin) (Figure 4-
c
).
Quad TR Motor Harness Assy.
Removal
To remove the Quad TR Motor Harness Assy., pro-
ceed as follows:
1. Remove the Motor Assy. (Figure 4-68
a
).
2. Remove the two (2) Screws (Figure 4-69
a
1
&
a
2
).
3. Remove the Detection Plate (Figure 4-69
b
), the
c
) and the Pinion Gear
d
) from the Quad TR Motor Harness
Assy. (Figure 4-69
e
).
Figure 4-65
Figure 4-65
TR Worm Wheel (Twin)
Removal (RQ Frame Unit) 1
b
a
2
1
Figure 4-66
Figure 4-66
TR Worm Wheel (Twin)
Removal (RQ Frame Unit) 2
b
a
1
a
2
a
3
5
a
4
a
6
a
7
a
8
Figure 4-67
Figure 4-67
TR Worm Wheel (Twin)
Removal (RQ Frame Unit) 3
a
b
2
c
1
Figure 4-68
Figure 4-68
Quad TR Motor Harness Assy.
Removal 1
a
Red
NOTE: For the reassembly, ensure that the
Motor Assy. is installed considering the
positions of the “Brown” and “Red” Cables.
Figure 4-69
Figure 4-69
Quad TR Motor Harness Assy.
Removal 2
c
b
1
a
2
d
e