© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 1 1
Calibration and Testing
UBA Pro RT/RQ™ Series Banknote Recycler
Section 6
Solenoid Test (RT Transport)
To perform the Recycler’s Solenoid Test on the RT
Transport side, proceed as follows:
1. Ensure that the Recycler and Cash Box is prop-
erly installed.
2. Launch the Performance Test Program (see
page 6-7).
3. Select “
TWIN_SOLENOID_TEST
a
).
4. Click the “
Start
”
Screen Button (Figure 6-
b
) to begin the Test.
5. Confirm the “
ON/OFF
” indication in the “
RC-
Solenoid (RC-Twin)
a
) is
switched as Solenoid moves automatically.
6. Click the “
Stop
”
b
) to end the test.
Drum 1 Motor Speed Test (RT Transport)
To perform the Drum 1 Motor Speed Test on the
RT Transport side, proceed as follows:
1. Ensure that the Recycler and Cash Box is prop-
erly installed.
2. Launch the Performance Test Program (see
3. Select “
TWIN_DRUM_MOTOR_TEST1
a
).
4. Click the “
Start
”
Screen Button (Figure 6-
b
) to begin the Test.
5. The measured speed will appear in the “
RC-Drum
Motor 1 (RC-Twin)
” area (Figure 6-50
a
) on the
Screen.
6. Confirm that the motor speed is in the acceptable
range:
700mm/sec to 950mm/sec (Forward/Reverse)
7. Click the “
Stop
”
Screen Button (Figure 6-
b
) to end the test.
Solenoid Test (RT Transport) 1
Figure 6-47
Solenoid Test (RT Transport) 1
a
b
Solenoid Test (RT Transport) 2
Figure 6-48
Solenoid Test (RT Transport) 2
a
b
Scroll
Figure 6-49
Figure 6-49
Drum 1 Motor Speed Test
(RT Transport) 1
b
a
Figure 6-50
Figure 6-50
Drum 1 Motor Speed Test
(RT Transport) 2
a
b
Scroll