Launch Performance Test Program
To launch the Performance Test program, proceed
as follows:
1. Remove electrical power.
2. Set each DIP Switch of the UBA Pro and the RT/
3. Connect the Unit to the PC.
(Refer to Figure 6-1 for the Tool Requirements
and Harness Connector locations).
4. Apply electrical power to the Unit.
5. The UBA Pro’s
Green
and
Red
Status LEDs will
be lit.
6. Launch the “
JCM Tool Suite Standard Edition
”
Application.
7. Click and hold-down the “
Service Mode
” Pull-
Down Menu.
8. Select “
Performance Test
a
).
9. The Performance Test Main Screen will appear
Status LED Test
To perform the Status LED Test, proceed as fol-
lows:
1. Launch the Performance Test Program (see
2. Select “
RC_COLLECT_AND_LED_TEST
a
).
3. Click the “
Start
”
Screen Button (Figure 6-
b
) to begin the Test.
4. Press the Status LED/Collect Button (Figure 6-32
a
).
5. Confirm that the Status LED is lit in the follow-
ing sequential order each time when pressing the
Status LED/Collect Button:
Green
=> Magenta
=> Cyan
=> Blue
=> Yellow
=> Red
=> White
=>
OFF
6. Click the “
Stop
”
Screen Button (Figure 6-
a
) to end the test.
Launch Performance Test Program
Figure 6-28
Launch Performance Test Program 1
DIP Switch #8 ON
DIP Switches All OFF
ON
1
2
3
4
5
6
7
8
ON
1
2
3
4
5
6
7
8
Launch Performance Test Program
Figure 6-29
Launch Performance Test Program 2
a
Launch Performance Test Program
Figure 6-30
Launch Performance Test Program 3
Figure 6-31
Figure 6-31
Status LED Test 1
a
b
Figure 6-32
Figure 6-32
Status LED Test 2
Figure 6-33
Figure 6-33
Status LED Test 3
a