14
20) Carefully position dust dome on cone.
21) Apply a heavy bead of glue around the dome.
22) Allow 30 minutes for adhesive to set, then apply another bead of glue around
the dome.
23) Install the new grille standoffs into the frame. The long standoffs are for the top holes.
24) Install the grille, using the 4 original screws.
25) Test speaker (See Test Specifications).
26
Inspect and clean the speaker. Return to service.
For EON15, EON Power15 and EON15P-1/230
NOTE: YOU MUST REMOVE THE BAFFLE FROM THE CABINET. USE CAUTION TO
AVOID DAMAGE TO THE BAFFLE GASKET AS IT CAN BE REUSED.
Tools Required
1)
.040" Pin Gauge
2)
#10 Torx Driver
3)
Phillips Screwdriver
4)
Prying Tool
5) Gap
Cleaning
Tape
6)
High Frequency Test Station
7)
Air Gun and Safety Glasses
Procedure
1)
Record Model number, Serial number, Date code and compliant for
warranty information.
2)
Lay the enclosure face down on a soft clean surface to avoid damage to the grille. The
woofer, or bottom of the product should be towards the front of the service table.
3)
Using a Phillips head screwdriver remove the 2 screws holding the handle and remove
the handle. Remove the 16 screws holding the baffle to the rear enclosure.
4)
Remove the rear enclosure from the front baffle using a pry tool. Begin by prying at the
bottom of the enclosure directly beneath the center mounting screw holes.
5)
Tilt the enclosure away from the baffle so it rests on it's top. Disconnect the transformer
wires from the A.C. input board as you are tilting if these wires are long enough.
6)
Pull the lead wires off the compression driver terminals.
Rediaphragm Instructions 2418H
Summary of Contents for EON15
Page 23: ...High Frequency Response EON Power15 and EON15P 1 230 33...
Page 24: ...Low Frequency Response EON Power15 and EON15P 1 230 34...
Page 30: ...Low Frequency Response EON PowerSub 40...
Page 35: ...High Frequency Response EON Power10 45...