background image

Maintenance

- Before carrying out maintenance, always disconnect the power supply and allow the equipment     
  to cool down.

- Periodically check all cable and tube connections.

- Replace a blown Fuse as follows:

1.

 Pull off the Fuse Holder and remove the 

Fuse. If necessary, use a flat screwdriver to 
lever it off.

- Replace any defective or damaged part. Only use original JBC spare parts.

- Repairs should be performed only by a JBC authorized technical service.

Fuse
Holder

2. 

Insert the new Fuse into the Fuse Holder and 

return it to the station.

8

Summary of Contents for UCR

Page 1: ...UCR Control Box for Robot INSTRUCTION MANUAL...

Page 2: ...it Power Cord 1 5m 1 unit Ref 0023714 230 V Functions Download the Robot Communication Protocol for UCR unit at www jbctools com jbcsoftware html There are up to 44 functions to control the station su...

Page 3: ...Short circuit Replace Cartridge 2 times Open circuit Replace Cartridge 3 times Tool not accepted Check if the tool is compatible with the Contron Box 4 times Tool detection error Check the tool 6 tim...

Page 4: ...nly three cables to the corresponding 3 pins at a typical DB9 male connector PLC or computer Download the Robot Communication Protocol at www jbctools com Communications Cable Ref 0020261 For detailed...

Page 5: ...e with R245 and R470 cartridge ranges Compatibility UCR can be used with both solderin irons TR and TRA and its cartridge ranges R245 and R470 respectively Connect any of those soldering irons with th...

Page 6: ...6 378 74 30 2 925 210 50 8 287 76 2 992 151 50 5 965 11 50 0 453 39 1 535 43 1 693 43 1 693 4 x M4 max depth 12 4 x M4 max depth 0 472 UCR245 5A UCR470 5A CONTROL UNIT FOR AUTOMATION 010618 Dimension...

Page 7: ...Work Place Example Not included sold separately TRA CSR SFR CLR UCR GSFR www jbctools com 7...

Page 8: ...ns Replace a blown Fuse as follows 1 Pull off the Fuse Holder and remove the Fuse If necessary use a flat screwdriver to lever it off Replace any defective or damaged part Only use original JBC spare...

Page 9: ...t is on Be sure that the power supply is disconnected before changing any spare part The temperature of accessible surfaces may remain high after the device is turned off Handle with care Heat can cau...

Page 10: ...Notes 10...

Page 11: ...ut Peak Power 250W Temperature Range 90 500 C 190 930 F Total Net Weight 2635 g 5 81 lb Package Dimensions Weight 328 x 258 x 208 mm 3215 g L x W x H 12 91 x 10 16 x 8019 in 7 09 lb UCR245 5A and UCR4...

Page 12: ...ranty covers this equipment against all manufacturing defects including the replacement of defective parts and labour Warranty does not cover product wear or misuse In order for the warranty to be val...

Reviews: