
ENGLISH
USER MANUAL
JB SYSTEMS
®
3/7
PARTY SPOT
In order to protect the device from overheat the cooling fans (if any) and ventilation openings should be
cleaned monthly.
The interior of the device should be cleaned annually using a vacuum cleaner or air-jet.
The cleaning of internal and external optical lenses and/or mirrors must be carried out periodically to
optimize light output. Cleaning frequency depends on the environment in which the fixture operates: damp,
smoky or particularly dirty surroundings can cause greater accumulation of dirt on the unit’s optics.
Clean with a soft cloth using normal glass cleaning products.
Always dry the parts carefully.
Attention: We strongly recommend internal cleaning to be carried out by qualified personnel!
DESCRIPTION:
1. DMX INPUT:
3pin male XLR-connector used to connect the
projector with the DMX controller or with the previous unit in the
DMX chain.
2. DMX OUTPUT:
3pin female XLR-connector used to connect the
projector with the next unit in the DMX chain.
3. Mains input:
with IEC socket and integrated fuse holder, connect
the supplied mains cable here..
4. Mains output
with IEC socket: you can use a special
Male/Female IEC power cable to connect this output with the
mains input of the next Party Spot for easier linking up to 10A.
you can also use our [JB Systems Combi Cable] to link power
and dmx signal with one cable.
5. DISPLAY
shows the various menus and the selected functions.
6. MODE button:
used to browse the different functions in the menu
7. UP button:
to increase the values shown on the display.
8. DOWN button:
to lower the values shown on the display.
9. ENTER button:
used to confirm your choice or to enter the setup
mode of a function.
OVERHEAD RIGGING
Important:
The installation must be carried out by qualified service personal only. Improper
installation can result in serious injuries and/or damage to property. Overhead rigging requires
extensive experience! Working load limits should be respected, certified installation materials
should be used, the installed device should be inspected regularly for safety.
Make sure the area below the installation place is free from unwanted persons during rigging, de-rigging
and servicing.
The device should be installed out of reach of people and outside areas where persons may walk by or be
seated.
Before rigging make sure that the installation area can hold a minimum point load of 10times the devic
e’s
weight.
Always use a certified safety cable that can hold 12times the weight of the device when installing the unit.
This secondary safety attachment should be installed in a way that no part of the installation can drop
more than 20cm if the main attachment fails.
The device should be well fixed; a free-swinging mounting is dangerous and may not be considered!
Don’t cover any ventilation openings as this may result in overheating.
The operator has to make sure that the safety-relating and machine-technical installations are approved by
an expert before using them for the first time. The installations should be inspected every year by a skilled
person to be sure that safety is still optimal.