![Jaypro Sports SMHA Installation And Maintenance Manual Download Page 5](http://html1.mh-extra.com/html/jaypro-sports/smha/smha_installation-and-maintenance-manual_3561102005.webp)
ITEM
QTY
DESCRIPTION
1
1
UPPER BOARD MOUNT
2
2
SADDLE BRACKET
3
2
M16 U-BOLT
4
4
M10 x 30mm CARRIAGE BOLT, ZP
5
2
M10 x 30mm LONG HEX BOLT, ZP
6
4
M10 x 40mm LONG HEX BOLT, ZP
ITEM
QTY
DESCRIPTION
7
10
M10 NYLON LOCKNUT, ZP
8
16
M10 FLAT WASHER, ZP
9
4
M16 FLANGE NUT, ZP
10
4
M10 NYLON SCREW
11
2
3/8-16 SERRATED FLANGE NUT - ZP
12
2
3/8-16 x 1-1/2 HEX CAP SCREW-ZP-Gr5
STEEL MANUAL HEIGHT ADJUSTER ASSEMBLY
SMHA
www.jaypro.com / (800) 243-0533 / 976 Hartford Tpke, Waterford, CT 06385 USA
SUBJECT TO CHANGES IN DESIGN AND MANUFACTURING
© COPYRIGHT 2021 JAYPRO SPORTS, LLC. ALL RIGHTS RESERVED
Rev - Published 7/28/21 Sheet 5 of 8
8
7
4
STEP 4:
Install upper board mount to the back of the
board. Board model GBRUB-42, 42" glass board
shown. Mounting for other boards will vary.
Torque the hardware to
44 ft-lbs
.
7
STEP 5:
Install the direct board mount hardware to secure the glass board to the height adjuster. This hardware is
supplied with the project hardware for the backstop structure. This hardware is NOT supplied with the height adjuster
or the goal itself. This hardware MUST be installed. Torque the hardware to
44 ft-lbs
.
HS
5351
3/8-16 x 1-1/2 HEX CAP SCREW
HN5042
3/8-16
SERRATED FLANGE NUT