2
These instructions should be read in conjunction with the
relevant
IS500
details in the full
Jayline
installation and
operating manual supplied with the fire
Following these instructions allows for the
IS500
to be safely
installed in a timber frame wall, without the need for further heat
protection beyond that supplied as part of the cabinet and flue
system.
WARNING:
It is critical that these instructions are followed fully and
that no substitute parts are used.
For floor protector and mantle extension details, refer to the full
manual, for approved clearances.
INSTALLATION NOTES
1.
IS500
zero clearance cabinet is approved to sit directly into a
timber frame.
2. Combustible materials can be in contact with the 25mm standoffs
fitted to the outside of the cabinet, but we recommend an
additional clearance o
f
25mm beyond the standoffs for ease of
moving into position without becoming jammed in the wall cavity
provided for the appliance.
3. Timber framing can be in contact with the 250mm diameter outer
casing where the 200mm diameter inner casing is at the height
also.
4. Timber framing must be 25mm clear of the 250mm diameter
outer casing if the 200mm diameter inner casing is not present
at that height.
5. The floor protector extension in front of the door shall be a
minimum of 8mm ceramic tiles if the floor is a heat sensitive
material.