background image

 

Stack 

The stack should be round, Ø 150 mm, whole 
brick lined.  

The minimum required boiler draft is 10 Pa. 

The stack should be high enough to prevent 
flue gases from polluting environment nearby.

Piping Installation 

The boiler is always connected to a 1800-
3000 liter energy accumulator. 

We recommend to install three thermometers 
into the battery: bottom, middle, and top. 

The system should be fitted with shutoff 
valves in order to ensure easy filling and emp-
tying of the boiler, accumulator, and heating 
system. 

The boiler should contain at least one 1.5 bar 
safety relief valve with a blowoff capacity of 
at least 150 kg/h if the maximum boiler power 
is 60 kW. The blowoff capacity can be dis-
tributed among two or three (maximum) 
valves if necessary. To confirm functionality, 

at least two safety relief valves are recom-
mended to be used at all times, each having 
the required blowoff capacity. The blowoff 
line of the safety valve should be laid to the 
floor drain to ensure that the drain can be no-
ticed and escaping vapor cannot constitute a 
hazard for people or property.  

The volume of the membrane expansion tank 
should be at least 5 % of the entire water 
space in the system.  

Piping should be installed to ensure that boiler 
operation, maintenance, and cleaning are un-
obstructed.

Electric Wiring 

The boiler power supply is 230 V / 50 Hz. 

The wiring should be connected to the termi-
nal block located behind the openable sensor 
panel. 

Electrical Diagram 

 

Power 

10 A 

3·1.5 mm

Charging 

pump

 

Service 

switch

 

Flue gas thermostat 0-

150 ºC

 

Lamp

 

Lamp

 

Smoke exhauster 

thermostat 90 ºC

 

Limiter 

 98 ºC

 

Extractor fan

 

Pump 

thermostat 

60-90 ºC

 

Summary of Contents for Econature40

Page 1: ...07 2011 SOLID FUEL BOILER INSTALLATION AND OPERATION MANUAL J SPI HEATING PROFESSIONAL www kaukora fi...

Page 2: ...t Connection Diagram 8 Boiler Operation and Maintenance 8 Fuel 8 Start up 9 Control Panel 9 Firewood burning 10 Combustion Air Control 11 Maintenance 12 Cleaning 13 Troubleshooting 13 The boiler water...

Page 3: ...ns at a temperature above 100 C when the temperature exceeds 280 C the resulting reaction causes heat re lease Secondary combustion the reaction between pyrolytic gases and oxygen begins at a temperat...

Page 4: ...ax temperature 110 C Min temperature 0 C Max pressure 3 0 bar Standard pressure 1 5 bar Proof test pressure 4 0 bar Power consumption 0 12 kW Voltage 230 V Frequency 50 Hz Body protection IP 2X Furnac...

Page 5: ...accumulator 10 R15 FH drain connection 11 R25 FH expansion connection 12 R15 FH flue gas sensor analyzer connec tion 13 Sensor panel 14 Flame monitor glass 15 Upper primary air adjusting damper 16 Low...

Page 6: ...extractor fan motor is changed Correct rota tion direction is marked on the flue swivelling joint with an arrow Boiler Room Leave free space of at least 1000 m in front of the filling and maintenance...

Page 7: ...r three maximum valves if necessary To confirm functionality at least two safety relief valves are recom mended to be used at all times each having the required blowoff capacity The blowoff line of th...

Page 8: ...ora tion and remove most of it through the stack as unburnt flue gases thus uselessly loosing part of energy and resulting in soot formation in the stack Firewood is considered dry when the moisture c...

Page 9: ...pera ture in the boiler 3 Pump thermostat 60 90 C Activates the charging pump when the boiler water achieves the setpoint The setpoint should be at least 85 C under normal operating conditions 4 Smoke...

Page 10: ...ard onto the bar so that the blocks touch the rear wall of the furnace Set the smoke exhauster thermostat to the setpoint which is about 90 C The set point is correct if the smoke exhauster stops when...

Page 11: ...and ratio for burning varies depending on the wood to be burnt Primary and secondary air is factory adjusted for birch firewood Upper primary air does not have to be ad justed under normal operating c...

Page 12: ...tains air oxygen The hot system pressure should be lower than 1 5 bar and the cold system pressure higher than 0 5 bar 1 5 bar safety relief The water volume varies as the tempera ture i e the higher...

Page 13: ...boiler water temperature does not rise to the desired level Ensure that the primary and secondary air ratio and access are correct Ensure that the firewood is dry If there is a cooling coil in the boi...

Page 14: ...that the thermostat indi cator lamp is on since the set value of the extractor thermostat is 90 C Check the set value of the flue gas ther mostat Check that the temperature limiter has not tripped For...

Page 15: ...170 C Reduced flue pressure Pump speed Pump speed Upper primary air 0 Lower primary air 0 Secondary air 0 Expansion tank pre pressure Signature Warranty The warranty is confirmed to be two years for t...

Page 16: ...dit agency Declared agency 0424 Inspecta EY inspection certificate for the development of RS 419 07 Testing has been conducted to EN 303 5 test agency SP Sveriges Tekniska Forskningsinstitut declared...

Reviews: