Installation Instructions (cont.)

3. 

level the bath and remove packing board:

a. 

Install the bath level for proper drainage. 

Jason baths are 

designed to be supported under the entire base of the 
bath. If the floor is smooth and level, the bath’s Level-
Form™ base will provide proper drainage and support

 

(see 

Figure 2

).  Mortar is required when the subfloor is 

not smooth and level; when additional sound insulation 
is desired; and/or when the bath is installed in a drop-in 
application.  In alcove installations a bed of mortar is 
recommended to aid in leveling the bath.  

NOTe:

  Do 

not use sand to install or level the bath.

b. 

remove the packing board before installing the bath

. Some  

soaking bath models may be shipped with a packing 
board  which  must  be  removed  before  installation.  

Detach the packing board from the bath. 

4. 

Protect the acrylic bath surface from damage during installation 

with a suitable material, 

i.e.

,

 cardboard and/or plastic film. 

5. 

Install the drain and overflow assembly

 onto the bath according 

to the instructions provided with the assemblies.  Position 
the bath in the area of intended installation.  

CLEANING

1. 

remove  all  loose  debris.

    Construction  plaster  or  excess 

grout can be removed with the use of a wooden-edged 
trowel.

2. 

Paint  or  tar  stains

  can  be  removed  with  paint  thinner, 

turpentine, or isopropyl alcohol (rubbing alcohol). Never 
allow the cleaner to soak against the acrylic surface for 
long periods of time.  

always rinse the surface immediately

 

following the use of cleaners. 

 

NOTe:  

Follow the manufacturers instructions for safe use 

of cleaning products. If the surface becomes scratched 
or  dulled,  it  may  be  restored  by  using  a  quality  plastic 
polish,  like  Novus  Plastic  Polish  No.  2  (available  from 
the  Jason  Dealer). 

 

It  is  always  preferable  to  protect  the 

acrylic  surface  during  installation  to  minimize  cleanup  and  

prevent surface damage.

WATER TESTING

Before finishing the installation, it is recommended that the 
bath and plumbing tested for leaks. 

1. 

Fill and operate the bath.

  Close the drain and fill the bath 

with at least two (2) inches of water. The incoming water 
temperature should not exceed 104°F (40°C). 

2. 

Inspect the plumbing for leaks.

 