background image

Jason International, Inc.  ·  501.771.4477                              Page 10 of 12                                              Customer Service: 800.255.5766 

Copyright © 2021 Jason International, Inc. 

 

ELECTRICAL INSTALLATION

 

These instructions are written assuming 60Hz, 120V 
power supply.  Verify the electrical requirements of the 
bath unit before installation.  Refer to the equipment 
labels for voltage and frequency requirements. 
 

Note:

  This bath is designed for indoor use only.  The 

electrical equipment must not be exposed to direct or 
indirect water or moisture contact.  The electrical 
equipment must also be protected from dust and other 
airborne debris before, during and after installation. 

 

A licensed electrician must provide the “dedicated” 
electrical service protected by a GFCI.  The location of 
the GFCI must be at least five (5) feet [152cm] away 
from the inside surface of the bath, accessible for 
regular testing.  Use copper conductors only. 

 

DANGER - RISK OF ELECTRIC SHOCK: 

Connect 

only to a circuit protected by a Ground Fault Circuit 
Interrupter (GFCI). In the unlikely occurrence of a 
current imbalance in the power conductors, the GFCI 
will interrupt the power to the bath. 

 

WARNING: The electrical service to the GFCI must 
not be interrupted by any control device. Likewise, 
the electrical service from the GFCI to the bath 
control should be direct and not interrupted by a 
switch. Never use a switch in conjunction with a 
control device. This will VOID THE 
M

ANUFACTURER’S WARRANTY. 

 

 

The pumps are supplied with an electrical bonding lug to 
allow connection of a solid copper bonding conductor 
between the unit and other electrical equipment and 
exposed metal in the area as may be required by local 
code.  

Note:

 The air blower

’s exterior housing is made of 

all plastic materials and does not require a bonding 
conductor. 
 
Grounding is required. The unit should be installed by a 
qualified service representative and properly grounded. 

 

Install the service connection at least six (6) inches 
[15cm] above the sub floor. 

 

All local and state electrical and plumbing codes 
must be observed.

  Where there are no local codes, the 

National Electric Code (NEC) and Uniform Plumbing 
Code (UPC) shall be observed.  It is the responsibility of 
the installer/owner to determine specific code 
compliance prior to installation of the product. 

 

Note:

  In the Commonwealth of Massachusetts, 

installation is to be done by a Massachusetts licensed 
plumber. 

 

DANGER - Do not alter the factory installed wiring. 
All building materials and wiring should be routed 
away from the equipment or other heat-producing 
components of the unit. 

 

   

 

  

INSTALLATION INSTRUCTIONS (cont.)

 

Whirlpool Connections

 

AirMasseur

®

 Connections

 

Note: The air switch tubing 
must also be installed to allow 
for a “drop loop” to prevent 
moisture from entering the air 
switch control box from the 
tubing. 

Summary of Contents for Excel Series

Page 1: ...installation Damage to the unit during installation will not be covered by warranty and is the responsibility of the installer ALL WARRANTY CLAIMS ON ACRYLIC SURFACE DAMAGE MUST BE MADE PRIOR TO INST...

Page 2: ...ol anticoagulants stimulants antihistamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Lower water temperatures are recommended for extended use exceeding 10 15 minutes and f...

Page 3: ...s de 10 15 minutes et pour les jeunes enfants F Puisque les temp ratures excessives ont un potentiel lev pour les f tus durant les premiers mois de la grossesse les femmes enceintes ou possiblement en...

Page 4: ...fore servicing For baths requiring two circuits CAUTION Not Suitable for Field Installed Heater ATTENTION la temperature ambiante sous la baignoire o l quipement est install ne doit pas d passer 50 C...

Page 5: ...her used as a hydrotherapy bath soaking bath or just taking a shower NOTE If the unit fails to operate check the breaker panel to ensure that the circuit breaker is on Check the GFCI by testing and re...

Page 6: ...llowing procedures should be followed Note Do no remote mount the blower more than 15 feet 4 5m away from the air inlet of the bath Choose a location as close as possible to the bath to ensure maximum...

Page 7: ...ghly after cleaning SURFACE MAINTENANCE Area with minor scratches or dull surfaces can be restored by applying commercially available plastic polish i e Novus Plastic Polish No 2 available at your Jas...

Page 8: ...um of 72 F 22 C 3 Drain and Overflow Install the drain and overflow assembly to the bath shell according to the instructions provided with the drain and position the bath in the area of intended insta...

Page 9: ...ce of this bath has been provided with a protective film which helps protect the bath during shipment and installation If the bath is tiled in remove the necessary portion of the film when installing...

Page 10: ...and not interrupted by a switch Never use a switch in conjunction with a control device This will VOID THE MANUFACTURER S WARRANTY The pumps are supplied with an electrical bonding lug to allow connec...

Page 11: ...If no voltage control is defective b Motor is not plugged into control box b Make sure plug is fully inserted into the control box outlet c Air switch Plastic air tubing disconnected or broken c Check...

Page 12: ...nt of equipment shall be F O B point of shipment This warranty shall not apply to any merchandise which has been subject to accident alteration abuse misuse abrasives corrosion and or electrolysis imp...

Reviews: