Jason International, Inc. •
501.771.4477
Page 2 of 5
Customer Service : 800.255.5766
Copyright © 2016 Jason International.
INSTALLATION
Remove the product from its packaging.
Read the entire
instructions prior to installing this product.
See the USER MAINTENANCE INSTRUCTIONS on page
5 for humidity and mold prevention suggestions prior
to Installation.
1. Position the template
to the finished floor in its desired
location. Transfer the centerlines of the template to the
finished floor.
CAUTION:
Use a marker, or tape that can be removed
from the finished floor after installation.
Tape the template to the finished floor using care to align
both centerlines and assure that the template is laying flat
on floor. See
Figure 2
and
Figure 2-A.
2. Cut or punch through the template
and mark the floor
where the two lines will represent the location of the interior
bottom supports.
3. Cut or fold back the template
to mark the outside of the
base lines. This will locate where the outside of the base
will be aligned.
With a straight edge and the marks from earlier, mark the
two lines on the floor, where the two bottom support ribs
will sit. The supports are approximately ½” [13mm] wide
and run the length of the base.
Figure 1-A
5. Attach the bath drain to the floor drain “P” trap.
CAUTION:
Only dry fit the drain to the “P” trap at this time.
Leave the drain assembly free standing in the “P” trap.
6. Place the bath
using caution not to scratch the surface.
Align the bath with the centerlines of the template. Assure
that the drain is positioned properly. Remove the bath and
the template.
7. Apply 1/4” to 3/8” [6 to 10mm] bead of adhesive
approximately 2” [5cm] from the end opposite the sump,
and all the way to the sump area. Apply the adhesive in a
zig-zag pattern, back and forth across the lines. This will
insure the supports locate in the adhesive. See
Figure 2
and
Figure 2-A.
.
8. Place 4 small blocks,
3/4” [19mm] thick at the edge line
of the base, to support the bath above the adhesive, until
it is aligned into place. Place the bath on the blocks and
align it with the marks created in step 1 above.
9. Once the bath is placed,
remove the blocks one at a time
,
and assure alignment with the marks. Now permanently
attach the drain tee to the “P” trap.
Allow 24 hours before using the bath to insure that the
adhesive has fully cured.
10. Fill the bath and check for any leaks.
Figure. 1
INSTALLATION INSTRUCTIONS