background image

Louvre Vent

----------

---

---

----------

---

---

Squeeze black framing together to secure the glass

Note:  Install 

washer between 

black louvre 

frame and the 

greenhouse 

upright at all four 

bolt locations.

Summary of Contents for Victorian Vi-23

Page 1: ...Victorian Vi 23 34 36 Version 2016_1 1 VICTORIAN ASSEMBLY INSTRUCTIONS ...

Page 2: ...crete foundation or on a solid packed surface with concrete anchors in the corners The solid concrete foundation should be deep enough to get a solid and frost free ground The greenhouse should be anchored securely and the anchors should be checked periodically During winter it is necessary to clear the roof of snow The greenhouse should be built in a location protected from strong winds Protectiv...

Page 3: ......

Page 4: ...iding door Curtain Rail Side Profile Turning Door Horizontal Profile Turning Door Side profile Turning Door Hanger for Sliding Door Vertical Glazing Bar Gable Profile Bottom guide for sliding door Rubber Gasket Roof Glass Support pieces ...

Page 5: ...in Vi36 3100 mm 122 04 in Vi23 3100 mm 122 04 in Vi34 4580 mm 180 31 in Vi36 6050 mm 238 19 in Note Do not set concrete in the corners until the entire greenhouse frame is complete You may need some play to install the uprights Royal Victorian ...

Page 6: ...Note Divide millimeters by 25 4 to get inches This pages applies when you have a dropped door kit ...

Page 7: ......

Page 8: ... Note Before assembling the foundation insert 3 M6x15 bolts as shown for the sliding door guide See page S1 Suggestion If the unit is to be installed on a concrete foundation you will need to cut PRO210 flush with the bottom of PRO6120 You can lay the cut off PRO210 peices on their side and use them to secure the PRO6120 to the concrete foundation ...

Page 9: ...Insert a bolt into each upright on the side where the top shelf will be located Insert a bolt in corner of front and back wall for Seed Tray See page ZB2 and SC1 ...

Page 10: ......

Page 11: ...install the L1 corner wind braces shown on page H10 Note If you have purchased shade curtains insert the slider loops into the gutter profile before this assembly step This is shown below 1 Twist lock per end 28 Slider loops per curtain ...

Page 12: ...dow See page LR1 Note A bolt needs to be added for the Seed Tray support See page ZB1 Vi34 Add one bolt in the center PRO1456 upright post Vi36 Vi46 Add one bolt in every other PRO1456 upright post Note Use PRO29909 for the door frame See pages S1 and A1 Note Sliding door can be placed in any section except the corner sections Note Louvre window can be placed in any section ...

Page 13: ...g H7 2 for roof supports Pg H9 3 for misting system Pg H14 Insert bolts to connect short uprights to the PRO6918 You will need as many bolts as you have short uprights ___ ___ _ _ _ _ _ _ _ _ Use the longer supplied bolts in this location They will ease the installation of the curtains and cross supports ...

Page 14: ... to install the roof braces Refer to page H10 Note If you have purchased curtains now is a good time to install the curtain rails Refer to page SD1 Note Add one bolt per end for the roof support tube See page H9 Vi 23 Vi34 36 ...

Page 15: ...Note Roof window can be installed in any bay Note When installing the roof uprights make note of which bays will have roof windows and insert a bolt for the connection plate ...

Page 16: ...Note Ends of support tube will need to be bent to fit Attach the lower end and adjust the top until it fits flush ...

Page 17: ...Drill a hole and attach wind brace to the roof profile with short screw or bolt Note Wait until assembly is complete before attaching the roof braces to the roof uprights ...

Page 18: ...f supports have been supplied Install the supports as shown as close to the center as possible Do not tighten the bolts Lift the roof beam up 1 2 inch and then tighten all of the bolts for the supports Additional Roof Support for models over 16ft ...

Page 19: ...n the back of the elbow and then a small hole in the frame of the greenhouse for the screw to thread into Run the screw through the hole on the inside of the elbow and into the greenhouse base Note Use a small slef tapping screw to attach the plastic gutter down spout to the gutter profile and also the down pipe to the plastic downspout Shown below ...

Page 20: ...te Glass supports slide in from the end of the gutter profile to support the bottom of the glass The supports should be spaced 100mm or 4 inches from each roof profile Roof Glass Support Installation H 14 ...

Page 21: ...n fix the shims to either side of the glass with a dab of silicon Then install the rubber trim Polycarbonate units will not use these shims Glazing Shim Installation Note Glazing shims are only installed in the end panels as shown below Space the glazing shims 100mm or 4 inches from the top and bottom ...

Page 22: ...l is only installed in the roof as shown Not along side walls Do not install crescent seal along side walls Note These trim plates are set in place with a dab of silicon and then the crescent seal is installed over them ...

Page 23: ...ycarbonate units only As shown below the blue transport tape is removed and replaced with a U profile The grey tape remains at the top to prevent contamination from dirt The U profiles are not used in the doors and windows ...

Page 24: ...This pages applies when you have a dropped door kit ...

Page 25: ...Sliding Door 1 2 3 Note If you have a double sliding door install this screw 1 inch from end ...

Page 26: ...Brush seal Note Rubber seal on installed on sides of door If you have two slidings doors the brush seal will only be installed on the outside edges Sliding Door Glass ...

Page 27: ...liding Door Note Apply upwards pressure when installing the door support in red Note Use washer underneath door hanger to level the door if needed Add L bracket to close the gap between the doors when they meet ...

Page 28: ......

Page 29: ...washer between black louvre frame and the greenhouse upright at all four bolt locations Note If your model is equipped with the louvre vent automatic opener please refer to the Installation and Care manual packaged with the opener ...

Page 30: ...Louvre Vent Squeeze black framing together to secure the glass Note Install washer between black louvre frame and the greenhouse upright at all four bolt locations ...

Page 31: ...1 inch long bolt Note A 1 inch long bolt is inserted into the lower profile This bolt is for the optional manual opener or the spindle opener Note Rubber seal is only installed on the sides of the roof window Glass ...

Page 32: ... part on the top of the roof window will slide into a groove in the roof beam shown below Note Inserting a bolt on either side of the roof window will prevent it from moving side to side Manual Opener is shown above This can be used in the winter when you want to secure the windows in the closed position ...

Page 33: ...to the roof crossbar for the lower mount The upper mount will clamp onto the lower roof window framing profile As shown in the diagram below The automatic opener comes with its own instructions and care guide These are located in the box with the opener Insert 2 bolts for lower mount ...

Page 34: ...k for level then mark and drill the second screw hole Now slide the brass part of the opener over the screw that you locked in place on the crossbar Use the supplied nylock nut to secure the opener on the top mounting bolt Finally thread the large side bolts into the U shaped mount and the opener is installed Note You can also mount the top with a screw as shown above Note A screw driver instead o...

Page 35: ...ed the misting system should be hung with bolts as shown to the left The hangers will need top be bent into position If there are no curtains it can be hung by drilling holes and hooking the hangers through them Shown below Misting System DA 5 If Equipped ...

Page 36: ...y fifth hole Suggestion If you forgot to insert the curtain loops you can drill a hole as shown and slide them in 1 Locking loop Note For models over 12ft you will need to connect the curtain rails together as shown Locking loop The curtain rails can be installed 2 ways If Equipped A B A Use the bolts in the roof profiles as mounting hardware B Use screws to attach the curtain rail to the roof pro...

Page 37: ... Note Make sure to slide 1 bolt into the bottom of the front and back seed tray profiles 2 for a Vi34 2 Slide the shelving inserts in from the open end You will need aproximately 11 3 4 for a Vi23 18 1 2 for a Vi34 Note The last shelving insert will need to be trimmed to fit 3 Install the 4th side ...

Page 38: ...st for you 5 Attach the seed tray to the uprights with self tapping screws If you do not have self tapping screws drill a small pilot hole and use regular screws Note If you have forgotten to insert the bolts you can use screws Make sure to use a screw with a shaft size of at least 1 8th inch in diameter Seed Tray If Equipped ...

Page 39: ...helf Suggestion Use a small strip of tape under each bolt to hold it in place This will make the shelf installtion a bit easier Tape shown as red dotted line The shelf can be installed at your desired height ...

Page 40: ...88 B 2500 Lier Belgium T 32 15 30 67 80 W www janssens alusystems be E info janssens alusystems be Customer Service or Assembly Questions Give us a call Toll free 1 877 760 8500 customerservice exaco com Exaco Trading www EXACO com ...

Reviews: