Scope of supply - basic device
Number
Designation
1
MRG 512-PRO PQ Flex
1
Supplementary description MRG 512-PRO PQ
1
Operation manual UMG 512-PRO
1
Carry case
1
Mains connection cable
4
Voltage pickoffs with fuses, black (gripping probes)
1
Voltage pickoff with fuse, blue (gripping probe)
1
Voltage measurement set (brown, black, grey, red, blue)
4
Rogowski coil with connection cable and plug (
ø
190 mm, L 600 mm)
1
Cross patch cable, CAT 5e
2
Connection cable with plug for residual current measurement, 3 m
(Residual current transformer not included in the scope of deliverables)
Concerning this operation manual
This description and the operating instructions for
the device are part of the product.
• Read this description and the operation manual
through prior to using the device.
• Keep this description and the operation manual
throughout the complete service life of the
product and have them readily available for
reference.
• Pass this description and the operation manual
on to each subsequent owner or user of the
product.
• In the event of questions that are not covered
by this operation manual for the UMG 512-
PRO, please contact the support department
of Janitza electronics GmbH (Tel. no. +49 6441-
9642-22).
This device must only be operated and repaired
by specialised personnel.
Connecting the measurement case
1.
Connect the mains cable to the measurement
case
(1)
and connect to 230 V / 50 Hz. Switch
on the measurement case via the on/off switch
(2)
. The "Mains OK"
(3)
and "Batt. OK"
(4)
LEDs
illuminate.
2.
Carry out basic settings on the UMG 512-PRO
(5)
, e.g.
- Voltage transformer / current transformer
settings
- Recording configuration or
- RCM measurement
(the transformer for RCM measurement is not
included in the scope of deliverables).
The settings can be implemented via the
accompanying GridVis software or directly on
the UMG 512-PRO (see the accompanying
instructions for the UMG 512-PRO for this).
3.
Set up the measurement transformer
(6)
- see
"Measurement transformer configuration"
chapter.
4.
Connect measured voltage with the voltage
tap-offs via the voltage inputs
(7)
or with the
measurement lines included in the scope of
deliverables. In doing so, observe the applicable
safety regulations.
5.
Connect current transformer coils (operating
current
(8)
or residual current
(9)
) with the
measurement case via the screw terminals.
6.
Connect the current transformer coils to the
consumer to be measured.
7.
Measurement starts
8.
After measurement is complete, switch the
device off
(2)
, disconnect from the object being
measured and disconnect from the mains!