Installation Instructions Janfire Pellet Boiler Integral Typ 25
IA 32580002 EN_Ver5
Janfire 2014
16(25
)
Start the circulation pump when the system is completely filled with water.
4.6 Ash Removal and Sweeping
During normal use (6-8 ton per year) of pellets of EN Plus class 1 the maximum interval for ash check and
cleaning is 10-12 months.
1. Stop the burner, see burner instructions.
2. Wait for approximately 30 minutes until all the pellets are no longer glowing.
3. Open the door of the combustion chamber. Remove the baffle plate (see Figures)
DANGER
Risk of burns
Note
The boiler and burner can still be hot.
4. Clean out the ash. The Janfire ash can makes the job easier.
5. Open the upper hatch (see Figure) above the tubes and take out the spirals.